• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/20

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

20 Cards in this Set

  • Front
  • Back
Acceptance Criteria
Those criteria, including performance requirements and essential conditions, which must be met before project deliverables are accepted.
Acquire Project Team (Process)
The process of confirming human resource availability and obtaining the team necessary to complete project assignments.
Activity
A component of work performed during the course of a project.
Activity Atributes (output/input)
Multiple attributes associated with each schedule activity that can be included within the activity list. Activity attributes include activity coeds, predecessor activities, successor activites, logical relationships, leads and lags, resource requirements, imposed dates, constraints, and assumptions.
Activity Code
one or more numerical or text values that identify characteristicsof the work or in some way catorgorize the schedule activity that allows filtering and ordering of activities within reports.
Activity Duration
The time in calendar units between the start and finish of a schedule activity
Activity Identifier
A dhort unique numerical or text identification assigned to each schedule activity to differentiate that project activity from other activities. Typically unique within any one project schedule network diagram.
Activity List (Output/Input)
A documented tabulation of schedule activites that shows the activity description, activity identifier, and a sufficiently detailed scope of work description so project team members understand what work is to be performed.
Actual Cost (AC)
Total costs actually incurred and recorded in accomplishing work performed during a given time period for a schedule activity or work breakdown structure component. Actual costs can sometimes be direct labor hours alone, direct costs alone, or all costs including indirect costs. Also referred to as the actual cost of work performed (ACWP).
Actual Duration
the time in calendar units between the actual start date of the schedule activity and either the data date of the project schedule if the schedule activity is in progress or the actual finish date if the schedule activity is complete.
Administer Procurements
The process of managing procurement relationships, monitoring contract performance, and making changes and corrections as needed.
Analogous Estimating
An estimating technique that uses the values of parameters, such as scope, cost, budget, and duration or measures of scales such as size, weight, and complexity from a previous, similar activity as the basis for estimating the same parameter or measure for a future activity.
Aplication Area
A category of projects that have common components significant in such projects, but are not needed or present in a ll projects. Application asreas are usually defined in terms of either the product (i.e., by similar technologies or production methods) or the type of customer (i.e., internal vs external, government vs commercial) or industry sector (i.e., utilities, automotive, aerospace, information technologies, etc.). Application areas can over lap.
Approved Change Request (Output/Input)
A change request that has been processed through the integrated change control process and approved.
Assumptions
Assumptions are factors that, for planning purposes, are considered to be true, real, or certain without proof or demonstration.
Assumptions Analysis
A technique that explores the accuracy of assumptions and identifies risks to the project from inaccuracy, inconsistency, or incompleteness of assumptions.
Authority
The right to apply project resources, expend funds, make decisions, or give approvals.
Backward Pass
The calculation of late finish dates and late start dates for the uncompleted portions of all schedule activities. Determined by working backwards through the schedule network logic from the project's end date.
Baseline
An approved plan for a project, plus or minus approved changes. It is compared to actual performance to determine if performance is within acceptable variance thresholds. generally refers to the current baseline, but may refer to the original or some other baseline. Usually used with a modifier (e.g., cost performance baseline, schedule baseline, performance measurement baseline, technical baseline).
Bottom-up Estimating
A method of estimating a component of work. The work is decomposed into more detail. An estimate is prepared of what is needed to meet the requirements of each of the lower, more detailed pieces of work, and these estimates are then aggregated into a total quantity for the component of work. The accuracy of bottom-up estimating is driven by the size and complexity of the work identified at the lower levels.