• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/23

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

23 Cards in this Set

  • Front
  • Back
  • 3rd side (hint)

What is the purpose of using a jib?

Increase height

When taking a side strain on a boom, what concerns the operator most?

Boom damage

You should always have at least how many wraps on a hoist drum?

2

How many randomly broken wires in one lay are required in a running wire rope before it must be taken out of service?

6

3 in one strand

When lifting personal in a man basket using 6 x 19 wire rope, the minimum safety factor is?

7

Double safety factor

When lifting personal in a man basket using 6 x 19 wire rope, the minimum safety factor is?

7

Double safety factor

What is the safety factor required when using non rotating wire rope and lifting personal in a man basket?

10

5 to 1 safety factor

When lifting personal in a man basket using 6 x 19 wire rope, the minimum safety factor is?

7

Double safety factor

What is the safety factor required when using non rotating wire rope and lifting personal in a man basket?

10

5 to 1 safety factor

Who has the responsibility for determining the correct weight of the load?

Supervisor

When working near a power lines when is a signal person required?

When crane moves within a booms length of powerlines

When working near a power lines when is a signal person required?

When crane moves within a booms length of powerlines

When an operator leaves the crane, he must first?

Put the load on the ground and put all dogs or pawls in

If replacing the hoist line wire rope on a crane, how do you determine the size or type of wire rope to use?

Use manufacturer’s operators manual or load chart

When making a multiple crane lift it is important for the operator to understand that?

The weight may increase if the other crane lands the load

If a crane is not set up level and the operator swings a load from the high side to the low side, the load radius will?

Increase

Most crane manufacturers reduce load capacity for duty-cycle operations because?

Side loading forces may occur

On who’s recommendation should a preventative maintenance program be set-up?

Crane manufacturer

On who’s recommendation should a preventative maintenance program be set-up?

Crane manufacturer

What is the standard rope used on most cranes?

Right regular lay

The proper way to calibrate a boom angle indicator is?

Using a level, raise the boom to horizontal and set the indicator to 0 degrees

The red area of an instrument gauge means?

A dangerous condition exists

The best way to keep people from being injured from the counter weight of the crane is to

Fence or barricade the swing area of the crane