Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
17 Cards in this Set
- Front
- Back
- 3rd side (hint)
Main power purpose |
The main power system distributes the electrical output from the main generator to the AC electrical distribution system and the pennsylvania-new jersey-maryland (PJM) power grid. |
obj 1 |
|
Main power transformers purpose |
Step up main generator output voltage from 25kV to 500kV for application to the 500kV switchyard. |
obj 2a |
|
Main generator disconnect (52x60) purpose |
Provides isolation capability for the main generator and main power transformers from the 500kV switchyard, allowing the 500kV switchyard to remain in a ring configuration. |
obj 2b |
|
Identify the purpose of the SF6 high pressure gas |
The high pressure SF6 gas, stored in a gas receiver, is used for arc quenching during breaker opening operations. Low pressure cutout (high pressure system) 240 psig @ 70°F Opens breaker closing control circuit and trips the breaker if the breaker is closed. This ensures the breaker is opened while there is sufficient high pressure SF6 gas for arc suppression and quenching. |
objective 4a |
|
Identify the purpose of the 500kV switchyard and breakers |
The purpose of the 500KV circuit breakers is to provide fault isolation of a transmission line without interrupting power to the operable lines. |
Objective 2c |
|
From memory summarize/identify the interlocks associated with the Main Power System that are required to enable turning gear operation |
Both Generator Output Breakers (500Kv Bus BS6-5 and BS2-6) are open. OR #1 Generator Main Trans 500Kv Disconnect (52X60) is open AND DC Control Power for the Disconnect Motor is available. |
objective 13 |
|
State the purpose of the station power transformers |
The purpose of the station power transformers is to supply power from the 500KV switchyard to the 13.8KV ring bus for station |
objective 2g |
|
State the purpose of the 13kV disconnect switches |
The purpose of the disconnect switches is to provide a mechanism to isolate sections of the 13.8KV ring bus for maintenance |
obj 2d |
|
Summarize / explain the interlock associated with 1T30, 3T30, and 13T30 (2T30, 4T30, and 24T30) |
Disconnects 4T30, 2T30 and 24T30 are interlocked such that only two of the three disconnects can be closed at one time. This interlock prevents paralleling the station power transformers through the 13.8KV switchgear. Disconnects 1T30, 3T30 and 13T30 are interlocked in a similar manner. All 13.8KV disconnect switches are mechanically interlocked with their associated ground switches. The ground switch cannot be closed until the disconnect is open and/or the disconnect cannot be closed until the ground switch is open. |
Objective 10 |
|
State the purpose of the 13.8kV ring bus |
Purpose - the 13.8KV ring bus provides the electrical tie between the 500KV switchyard and the station AC electrical distribution system. |
Objective 2e.
|
|
State the purpose and voltages of the station light and power transformers |
#1/2 SLP are 13.8kv/208/110v - switchyard utility use. #3/4 SLP 13.8/13.8. - 13.8KV supplies power to the island substation ring bus |
objective 2h / 2i / 7 |
|
Identify three major automatic actions which will occur if a generator or unit lockout is initiated (exclude alarm) |
1. Trips and blocks closing of generator output breaker BS6-5 and BS2-6 |
Objective 19 |
|
Summarize the immediate action required by HC.OP-AB.ZZ-0135 |
IF the EDG fails to start automatically, THEN START AND LOAD as necessary |
objective 22
|
|
Name the 13.8 kV yard interlock associated with the breaker lineup. |
An operator can't close bkr 2-3 without either 1-2 or 4-5 open first (same interlock exists between 7-8 and 6-7 & 9-0) |
|
|
How many bus sections are on the 500 kV ring bus? |
6 #1 Bus section 10 #2 Salem - 5037 and bus section 10 #3 Red Lion - 5015 #5 New Freedom - 5023 #6 Main Generator
|
|
|
What is the bus section are on the 13.8 kV ring bus? |
10 #1 Station transformer T1 #2 BX501 (1E) / 502 / 503 #3 SLP1 - 500 kV switchyard #4 CX501 and SLP3 (island ring bus) #5 Station transformer T2 #6 Station transformer T4 #7 AX501 (1E) / 502 / 503 #8 SLP2 - 500 kV switchyard #9 DX501 and SLP4 #10 Station transformer T3 |
|
|
What interlocks associated with the main power system? |
Mnemonic - The Grumpy Little Policeman Denied Parole To 3 Lovely Blow Pushers |
|