• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/108

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

108 Cards in this Set

  • Front
  • Back

True or False



IMS stands for Integrated Management System.

False



Integrated Merchandise System

What is writing a PO also called?

cutting a PO

What does PO stand for?

Purchase Order

A PO initiates paper trail associated with a specific job and can be treated as a mini __________ .

contract

Who prepares the schedule?

Production Manager

In the planning stage, what step occurs PRIOR to order entry?

information gathering

Once order entry is complete, info pertinent to the job such as quantity, colours used, finished can be found on what?

Job Docket

What outlines how purchases are authorized and the objective behind them?

Purchasing mandate

_________ scheduling is usually associated with drop dead projects.

Backward

What does PVL stand for?

Preferred Vendor List

What type of doc, created by the printer, initiates a paper trial associated with a specific job, once accepted by the seller becomes a contract bidding on both parties?

Purchasing order

According to the 2013/2014 PIA/GATF ration, the largest major cost item for a printer is?

Materials

To ease scheduling, what approach is adopted by many print companies to internalize a mix of both tradition and digital equipment?

Hybrid Approach

Who keeps in contact with the client and sales representative throughout the job?

CSR

What does WIP stand for?

Work In Progress

What are the 4 constraints on planning?

cost, capacity, quality, timing

The goals of scheduling are as fellows:


- minimize completion time


- maximize ____________


- minimize work in progress (WIP) inventory


- minimize production bottlenecks and downtime

capacity

CAD scheduling requires _________ intervention since practicality can not be programmed.

human

What are the 3 type of delivery dates?

drop dead


regular turn around


filler

What does DMIAC stand for?

Define


Measure


Analyze


Improve


Control

In lean manufacturing, "value” should always be seen from the point of view of the ____________ .

customer

What question dies the “Analyze” step in the six sigma DMIAC cycle ask?

What is the root cause of the problem?

Having unnecessary inventory can be a result of _______ purchasing.

over

Rejected products fits under what category of waste?

defects

Makeready is an example of a _________ added activity.

nonvalue added

According to the NAPL survey on capital investment, what was the 1st most trusted source of info when companies were looking to buy new equipment?

own expertise

True or False



Six Sigma reduces process variation.

True

What does DPMO stand for?

Defects Per Million Opportunities

The “ramp” in the PDCA cycle diagram in TQM signifies _____________ ____________ .

continual improvement

What % of products are statistically expected to be defect free in six sigma?

99.99966%

What independent and non-governmental run international association promotes standards?

ISO

True or False



ISO stands for International Specifications Organization.

False



International Standards Organization

At what phase of the DMAIC cycle do you implement your plan?

Improve

A customer gives you the wrong address for a delivery and now you must drive to a new location. What category of waste does this fall under?

transport

True or False



There is one defect found in every 295,000 products.

False



294,000

Your delivery man feels comfortable driving at 100km/hr. This is an example of a _________________ unit of measure.

multidimensional

What are the 2 attributes for effective KPIs?

number and unit of measure

What are the 2 categories, based on PIA, that your company needs to concentrate on to develop a higher profit?

productivity and efficiency

What does KPI stand for?

Key Performance Indicators

The “profit leaders” in the PIA ratios are the top what % of printers?

25%

True or False



The effectiveness KPI looks at actual output vs. planned output.

True

Performance ______________ tells you how your company is doing financially compared to others.

benchmarking

What is the PIA Ratio?

A financial report based on current data compared to top 25% of participating profit leaders.

True or False



Quality is the degree at which a product meets expectations.

True

Which KPI category determines cost efficiency?

productivity

According to the NAPL survey on capital investment, what was the 3rd most trusted source of info when companies were looking to buy new equipment?

associations/friends

Employment policies comply with _________ and create consistency through ____________.

laws


procedures

Which KPI category is measured against cost, time and resources and tells you how well the process performs a task?

efficiency

True or False



Joe Danca spoke to our class about sustainability.

False

Timeliness is measured by comparing the number of units _________ on time vs. total number of units _________.

units produced on time vs. total units produced

What does ESA stand for?

Employee Standards Act

What are the 3 skill levels determined by the CPISC?

operational


core


basic

A performance evaluation is a formal _________ evaluation (can occur yearly, quarterly)

periodic

The practice of always hiring and promoting internally can create a problem where everyone thinks the same is also known as _________ ___________ .

group think

True or False



The CPISC gives us strategies for skill development on an international level.

False



national

Motivation is influenced by __________ actions but should spring from the individual (internal).

external

What is the Payback Method equation?

Payback Period = Investment/Benefits per Year

A master contract aids _________ transactions.

future

________________ is influenced by external actions but its effects are removed once you take out prize.

Incentives

What is the difference between location and layout?

Location


- where best to site the facility


Layout


- how best to arrange staff, processes and equipment

The Payback Method tells us the number of _______ you will recover the amount invested.

years

According to the NAPL survey on capital investment, what was the 2nd most trusted source of info when companies were looking to buy new equipment?

peer groups

When evaluating investments, the mission and vision statement are examples of ________ factors.

strategic

Which type of lease has a term length less than 75% of its useful life?

operating

True or False



A capital lease has a bargaining option to buy the equipment for less than fair market value.

True

What are the common types of machine layouts?

L shape, U shape and straight line

What is the following formula for?



Cost estimate + Sales markup = ??

quote

What are the 3 reasons a company chooses to tender a RFP?

economic (compare prices)


political (required by law)


social (more sustainable etc.)

A “big ticket item” is another name for __________ ____________ .

captial investment

True or False



The core values in a mission statement are characteristics you cant live without.

False



core values are in the vision statement

What is the Job Costing equation?

Job Order Costing = Direct Labour + Direct Materials + Overhead

The timeliness KPI measures if the product is done on time and _________ .

correctly

What is the difference between a tender and a quote?

tender has intention to buy, quotation does not

What are the 5 themes of enterprise systems?

automation, efficiency, profitability, integration, transparency

What does SAAS stand for?

Software As A Service

_____________ Harrelson invested in the wheat paper industry.

Woody

Which type of manufacturing layout is for low volume custom made products?

process layout

Scheduling orders _______ so we can use resources between tasks.

tasks

What is a pass or fail test to request a proposal or not?

Go or Not Go

The unnecessary motion category of waste deals with people, ______________ and injury.

ergonomics

What are the 3 responsibilities of a production manager?

-scheduling


-keeps CSR up to date


-coordinates vendors

When a company has too little capacity it means they can not meet _________.

demand

True or False



Nonvalue added activities do not increase the value but advances the product.

False

_________ scheduling is usually associated with filler projects.

Forward

What is a buyer generated document authorizing a purchase?

Purchase Order

What does Total Quality Management and Lean manufacturing have in common?

from japan


improve flow


analytical tools

The PIA ratip report provides an accurate ____________ of the industry.

snapshot

The press operator is found taking extra long breaks. What category of waste does this fall under?

Waiting

In the DMIAC cycle, the "control" phase utilizes a _______ to control and sustain.

scorecard

True or False



The efficiency KPI compares actual input vs. planned input.

True

Makeready is falls under which category of waste?

process

Employment policies governs the _________ and ________ of employees.

work and actions

The press operator walks up to you and says, "the Goss press prints 3000copies." What unit of measure is being expressed?

single dimensional

The PIA ratio report helps companies develop higher _______ and contain expenses.

profit

True or False



Benefits should not be included when writing a job discription.

False

Joe Danca is the Account and Operations Director at IMS, who are their 2 main customers?

McDonalds and Kraft

According to a provided reading, what are the 3 tools for the savvy project manager?

scheduling backwards


plan the distribution


sign off

When looking at KPI information, the numbers must be _________ and valid.

accurate

True or False



Employees can file claims if the workplace doesnt comply with the ESA.

True

What 2 things do key metrics tell the manger and employees?

what we are doing well


what we need to improve

Which type of lease allows you to file your lease payment as a rental expense on your taxes?

Operating lease

The goal of the CPISC is to develop and maintaina skilled _________.

workforce

When writing a job description, small businesses want to be clear but __________.

flexible

True or False



When writing a job description large companies want tasks and responsibilties to be specific.

True

When evaluating investments, ________ factors are good for long term considerations.

strategic

What are the 5 target areas a company can choose from to excel in?

cost, quality, delivery, flexibility and innovation

Which lease allows ownership of asset can be transferred to the lessee at the end of term?

Capital lease

High production costs and inefficient use of resources are the results of too _______ capacity.

much