• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/30

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

30 Cards in this Set

  • Front
  • Back

Conventional MCRT

5-15 days

Conventional F:M ratio

0.2-0.4

Conventional Organic loading rate

20-40 lb BOD/d*1000 cubic feet

Conventional MLSS

1,500-3,000 mg/L

Conventional Aerator Detention Time

4-8 hours

Conventional Return rate (Percent of Q)

25-50%

Complete-Mix MCRT

5-15 days

Complete-Mix F:M Ratio

0.2-0.6

Complete-Mix Organic Loading rate

50-120

Complete-Mix MLSS

3,000-6,000 mg/L

Complete-Mix Aerator detention time

3-5 hours

Complete-Mix Return Rate

25-100

Step Feed (Aeration) MCRT

5-15 days

Step Feed (Aeration) F:M Ratio

0.2-0.4

Step Feed (Aeration) Organic Loading Rate

40-60

Step Feed (Aeration) MLSS

2,000-3,500 mg/L

Step Feed (Aeration) Aerator Detention time

3-5 hours

Step Feed (Aeration) Return rate

25-75

Extended Aeration MCRT

20-30 days

Extended Aeration F:M Ratio

.05 - 0.15

Extended Aeration Organic Loading Rate

10-25

Extended Aeration MLSS

3,000-6,000 mg/L

Extended Aeration Aerator Detention Time

18-36 hours

Extended Aeration Return Rate

75-150

Contact-Stabilization MCRT

5-15 days

Contact-Stabilization F:M Ratio

0.2-0.6

Contact-Stabilization Organic Loading

60-75

Contact-Stabilization MLSS

1,000-3,000 mg/L (Contact Tank)


4,000-10,000 mg/L (Stabilization Tank)

Contact-Stabilization Aerator detention time

0.5-1


3-6 hours

Contact-Stabilization Return Rate

25-100