• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/9

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

9 Cards in this Set

  • Front
  • Back

BOQ shall be deemed to be read in conjunction with Preamble Clauses.

BOQ shall be read in conjunction with Contract Agreement.

including all wastage of materials

the valuation of variation


or the assessment of variation

Remeasurement - Fixed Unit price Contract

- comply with the terms of contract


- obey regulations legal


- shall be met rules of...

strutting and shoring methods

strutting and shoring methods



scaffolding

scaffolding

Material

- ancillary material


- spare material

Taking Over

Fidic: Employer's Taking over




- Taking-over Certificate




--> Taking over of the Works and Sections were completed in accordance with the Contract.

Obligation and Rights


Liability (responsibility)

...

to carry out


to perform


to ...



The Contractor shall carry out the Tests on Completion and all Defects...

The cost components of a certain product include the following:


- Material cost


- Labour cost


- Equipment usage cost


- Overhead/Indirect cost


- Estimated profit and taxes

...