• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/3

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

3 Cards in this Set

  • Front
  • Back

Pump drills

-Dumping air



- Check both sides of appliance first



- augment water suppky- get hoses to hydrant



-Hydrant ready (turn on)



water on the hydrant



Water on, delivery number, floor Working on, pressure required.



Knock off water supply hydrant/branch



Release hydrant pressure yellow switch on pump bay



Knock off make up - stop drill pack gear away.



Raising air- check both sides of appliance.



Drill complete all gear made up



Crew dismount





1- 45mm hose and RB101


2- pump operator


3-70 mm hose and branch tally


4- set hydrant-2 lengths of 70 mm hose.


Hauling aloft

Up top



Below



Stand from under



Clear there




Haul aloft equipment (repeat)



Right (ready to haul)



Well (equipment just below sill)



(HAUL Away from building)



Below



Up top



Haul away from building



Grab hose walk away from building



Right




Ladder commands

(Slip)



Standby to slip



Release



Slip




(pitch)



Site heel no.3



Under run



Prepare to extend



Extend



Well (ground props on 135 ladder)



Pawls extended (no.3)



Head/heel left/right/ in/ out



Ladder pitched, get to work




(Make up)



Head out



Extend to lower



Lower



Clear behind (no.3)



Under run




(Launch)



Standby to launch



Launch



House



Ladder secure.