term1 Definition1term2 Definition2term3 Definition3
Please sign in to your Google account to access your documents:
Pump drills
-Dumping air
- Check both sides of appliance first
- augment water suppky- get hoses to hydrant
-Hydrant ready (turn on)
water on the hydrant
Water on, delivery number, floor Working on, pressure required.
Knock off water supply hydrant/branch
Release hydrant pressure yellow switch on pump bay
Knock off make up - stop drill pack gear away.
Raising air- check both sides of appliance.
Drill complete all gear made up
Crew dismount
1- 45mm hose and RB101
2- pump operator
3-70 mm hose and branch tally
4- set hydrant-2 lengths of 70 mm hose.
Hauling aloft
Up top
Below
Stand from under
Clear there
Haul aloft equipment (repeat)
Right (ready to haul)
Well (equipment just below sill)
(HAUL Away from building)
Haul away from building
Grab hose walk away from building
Right
Ladder commands
(Slip)
Standby to slip
Release
Slip
(pitch)
Site heel no.3
Under run
Prepare to extend
Extend
Well (ground props on 135 ladder)
Pawls extended (no.3)
Head/heel left/right/ in/ out
Ladder pitched, get to work
(Make up)
Head out
Extend to lower
Lower
Clear behind (no.3)
(Launch)
Standby to launch
Launch
House
Ladder secure.
Need help typing ? See our FAQ (opens in new window)
Please sign in to create this set. We'll bring you back here when you are done.
Discard Changes Sign in
Please sign in to add to folders.
Sign in
Don't have an account? Sign Up »
You have created 2 folders. Please upgrade to Cram Premium to create hundreds of folders!