• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/5

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

5 Cards in this Set

  • Front
  • Back

When is plumbing rough in installed during the building process?

It is installed after framing and HVAC is finished and before insulation is installed.

List the different task the plumber is responsible for

making green choices about elements of the plumbing system like


-supply


-drainage


-waste


-ventilation layout


- fixtures


-equipment


- water conserving practices

Who is responsible for air sealing around plumbing pipes?

Plumber discusses with building team/ contractor

Describe the manifold of plumbing water supply and it's benefit.

Manifold system uses more pipe, but there are less heat lost because the pip diameter is smaller, often only 3/8" and the length of pipe from the water heater to fixture is shorter.

What steps can be taken to conserve energy on almost all existing residential plumbing installations?

-Insulating hot water pipes


-use energy efficient products


- plumbing systems that conserve water