When is plumbing rough in installed during the building process? |
It is installed after framing and HVAC is finished and before insulation is installed. |
|
List the different task the plumber is responsible for |
making green choices about elements of the plumbing system like -supply -drainage -waste -ventilation layout - fixtures -equipment - water conserving practices |
|
Who is responsible for air sealing around plumbing pipes? |
Plumber discusses with building team/ contractor |
|
Describe the manifold of plumbing water supply and it's benefit. |
Manifold system uses more pipe, but there are less heat lost because the pip diameter is smaller, often only 3/8" and the length of pipe from the water heater to fixture is shorter. |
|
What steps can be taken to conserve energy on almost all existing residential plumbing installations? |
-Insulating hot water pipes -use energy efficient products - plumbing systems that conserve water |