term1 Definition1term2 Definition2term3 Definition3
Please sign in to your Google account to access your documents:
When is plumbing rough in installed during the building process?
It is installed after framing and HVAC is finished and before insulation is installed.
List the different task the plumber is responsible for
making green choices about elements of the plumbing system like
-supply
-drainage
-waste
-ventilation layout
- fixtures
-equipment
- water conserving practices
Who is responsible for air sealing around plumbing pipes?
Plumber discusses with building team/ contractor
Describe the manifold of plumbing water supply and it's benefit.
Manifold system uses more pipe, but there are less heat lost because the pip diameter is smaller, often only 3/8" and the length of pipe from the water heater to fixture is shorter.
What steps can be taken to conserve energy on almost all existing residential plumbing installations?
-Insulating hot water pipes
-use energy efficient products
- plumbing systems that conserve water
Need help typing ? See our FAQ (opens in new window)
Please sign in to create this set. We'll bring you back here when you are done.
Discard Changes Sign in
Please sign in to add to folders.
Sign in
Don't have an account? Sign Up »
You have created 2 folders. Please upgrade to Cram Premium to create hundreds of folders!