• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/159

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

159 Cards in this Set

  • Front
  • Back

focuses on the speaker and ignores other distractions. basically paying attention to the message

Attending pg 721

Look at the speaker, think about what's being said, visualize the situation be talked about.

Attending


Be ready to listen. Pg 721

wait until the speaker has finished delivering the message before responding.

Attending


Listen to the complete message pg 721

Listen to both verbal and nonverbal messages

Attending


Maintain eye contact. pg 721

Sitting behind a desk can place a physical and psychological barrier between the listener and the speaker.

Attending


Remove physical barriers. pg 721

Dividing attention between multiple speakers will guarantee that parts of the message will be lost.

Attending


Listen to one speaker at a time pg 721

Consist of decoding a message and assigning meaning to it.

understanding pg 721

Organize the message into a logical pattern

understanding pg 721

Observe nonverbal clues to help with the meaning of the message.

understanding pg 721

Ask questions to clarify the meaning of the message

understand pg 721

involves retaining what has been said which is critical for the message to have the correct effect

remembering pg 721

Repeat to the information to do what?

remembering pg 721

When possible take note which is effective and important.

remembering pg 721

Involves critically analyzing the message to determine how factual it really is.

evaluating pg 721

the listener must be able to separate facts from opinion.

evaluating pg 721

involves the feedback portion of the communication process and means an exchange of roles.

responding pg 722

with out this ______ speaker does not know if the message was received, understood or acted on

responding pg 722

Originates a message by encoding or turning thoughts and mental images into words

sender pg 723

contains a meaning idea or concept that a speaker is attempting to communicate to the receiver.

message pg 723

Auditory

Message (spoke) pg 723

Visual

Message (sight ) pg 723

tactile

Message (touch) pg 723

olfactory

message (smell) pg 723

gustatory

message (taste) pg 723

gestural

message (a motion) pg 723

give the path that a message takes between the sender and the receiver

medium or channel pg 723

usually face to face in most interpersonal communication situations

medium or channel pg 723

accepts a message and decodes or interprets it

receiver pg 723

education, cultural background, perception, attitude, and context all provide interpretation of the message

receiver pg 723

prevents the receiver from fully receiving a message.

interference pg 724

may be provided by internal or external sources

interference pg 724

receiver has a hearing impairment

interference (internal barrier) pg 724

Excessive noise is in the area

interference (external barrier) pg 724

completes the communication process, resulting in an ongoing cycle

feedback (response) to the sender pg 724

recognize listener as having a different point of view and attempt to relate to it rather than make fun of it.

engage in dual perspective pg 725

do not blame someone else for personal feelings and thoughts.

take responsibility for personal feelings and thoughts pg 725

avoid trying to apply personal feelings to another persons such as saying I know how you feel

show respect for the feelings and thoughts of the other person. pg 725

avoid abstract vernacular language or phrases that can cause misunderstandings

try to gain accuracy and clarity in speaking pg 726

speak slowly and clearly if a person is deaf.

be aware of any special needs of the receiver pg 726

what to do if emotions are not under control

avoid speaking or addressing a problem while under angry or emotional. pg 726

Learn to modify the use of eye contact when it is appropriate.

eye contact pg 726

self confidence by standing tall and erect

body language pg 726

match face to message

facial expression pg 726

learn to control ______ that are annoying or distracting to others.

gestures pg 726

is accomplished through practice and a command of the information or topic in message

poise pg 726

set an example for subordinates and require the same level of _______________

personal appearance pg 726

Can have both a positive or negative effect

touch pg 726

determine the use of space and apply it appropriately

proximity pg 726

adjust the application of ____ based on individual or groups that are present

use of time pg 726

Gain the ______________ of the listeners

attention pg 727

describe the problem and demonstrate a ______ for a change in the current situation.

need pg 727

providing sufficient information and evidence to allow the listener to accomplish the goal

satisfaction pg 727

describe the solution for the problem and how it will benefit the listener.

visualization pg 727

state what the listener will need to take to solve the problem and complete.

action pg 727

Helmet/hard hat


Gloves


Safety shoes or boots

equipment lists pg 728

respirator self contained breathing apparatus, supplied air, air purifying

equipment lists pg 729

protective clothing


spill- protective clothing


flashlight

equipment lists pg 729

hand cleaning materials


eye protection


hearing protection

equipment lists pg 729

coveralls


clipboard w/Inspection forms


electron. data collection

equipment lists pg 729

material sketches/maps


measuring tape


camera


equipment lists pg 729

Pitot tube and gauge, hydrant wrench, static pressure cap gauge for water supply testing

equipment lists pg 729

reference materials code books, code sections copies, building plans, previous reports

equipment lists pg 729

size of the facility or occupancy

inspection scheduling pg 730

complexity of operations or processes within the occupancy

inspection scheduling pg 730

weather it is a regular periodic inspection or a follow up inspection

inspection scheduling pg 730

location of the facility or occupancy

inspection scheduling pg 730

inspector's familiarity and experience with the occupancy

inspection scheduling pg 730

ensure compliance with posted occupant loads

inspections normal working hours pg 731

look for locked, blocked, or obstructed exits

inspections normal working hours pg 731

Investigate public complaints

inspections normal working hours pg 731

locations hydrants, alt. water sources, FDC, Match

general inspection procedures pg 733

Building name and address match

general inspection procedures pg 733

Address number conformed and clearly visible

general inspection procedures pg 733

Exterior maintenance or house keeping

general inspection procedures pg 733

type of occupancy match

general inspection procedures pg 733

number of stories of the structure match

general inspection procedures pg 733

proximity to other structures or potential exposures

general inspection procedures pg 733

construction, renovation, demolition activities (special or temp fire & life safety conditions)

general inspection procedures pg 733

start from the roof and work downward

common inspection method pg 735

start from the basement and work upward

common inspection method pg 735

follow an established manufacturing process from raw materials to the finished product and all storage areas

common inspection method pg 735

Inspection agency's name

inspection checklist pg 740

Date of inspection

inspection checklist pg 740

name and address of occupancy being inspected

inspection checklist pg 740

name and phone number of person in charge of occupancy owner if not the same person

inspection checklist pg 740

name of building representative who accompanied inspector

inspection checklist pg 740

occupancy classification

inspection checklist pg 740

height of building and number of stories above and below grade

inspection checklist pg 740

interior and exterior finishes

inspection checklist pg 740

exit information

inspection checklist pg 740

fire protection features

inspection checklist pg 740

all other areas that must be checked to ensure code compliance

inspection checklist pg 740

space to note things that are not otherwise contained on checklists

inspection checklist pg 740

indicates how buildings/structures are situated with respect to other structures and streets in the area

plot plan


inspection drawing pg 740

shows the layout of individual floors, subfloors, and roofs

floor plan


inspection drawing pg 740

shows side views of structures depicting the number of floors and grade of the surrounding ground.

elevation


inspection drawing pg 740

location of the building on the property

plot & floor plan pg 741

orientation of the building

plot & floor plan pg 741

other structures on the property

plot & floor plan pg 741

dimensions of the building

plot & floor plan pg 741

access point to the porperty

plot & floor plan pg 741

locations of hazard

plot & floor plan pg 741

Location of fire protection systems

plot & floor plan pg 741

building entrances and exits

plot & floor plan pg 741

obstructions to fire department access

plot & floor plan pg 741

Must fully explain the problem noted, offer solution

violation discussions pg 743

old structure is remodeled or renovated

building occupancy change pg 742

be aware of what ___________before conducting the inspection.

original occupancy classification pg 742

affects means of egress

building occupancy change pg 742

affects fire protection equipment design or installation

building occupancy change pg 742

affects detection and alarm system design or installation

building occupancy change pg 742

affects emergency lighting

building occupancy change pg 742

affects occupant load calculations.

building occupancy change pg 742

affects sprinkler or discharge devices

building occupancy layout change pg 742

review inspection noting good conditions and those needing correction.

final interview. pg 742

inspection is also an educational opportunity

final interview pg 742

if owner is hostile during inspection review inspector should

remain professional and avoid arguments pg 742

Inspector should greet the owner/occupants or building representatives

first step to inspection pg 734

provide official identification

first step to inspection pg 734

Purpose of visit is explained

first step to inspection pg 734

question regarding inspections are answered

first step to inspection pg 734

Organization's letterhead

heading


formal business letter pg 760

two lines below the heading on either left or right margin

date line


formal business letter pg 760

name, title, address of person receiving letter

inside address


formal business letter pg 760

focuses attention on content of letter

subject line


formal business letter pg 760

addresses the reader

salutation


formal business letter pg 760

message, details of the topic, conclusion

body


formal business letter pg 760

complimentary closing, writers identification, reference or filing initials

closing


formal business letter pg 760

all levels of management, supervisory staff,

emergency evacuation drill 749

final notice, date of re-inspection, legal action taken

violation not corrected pg 746

involves evacuating a single room

phase 1 pf 752

remove those in immediate danger

phase 1 R react pg 752

ensure the room door is closed

phase 1 E pg 752


Activate the fire alarm/notify agency

phase 1 A pg 752

Call the fire dept. of PD

phase 1 C pg 752

Try to extinguish

phase 1 T pg 752

remove patients

phase 1 Race pg 752

Alert (911)

phase 1 A pg 752

Confine (close off the area of origin

phase 1 C pg 752

Extinguish (if able to)

phase 1 E race pg 752

Evacuate an entire zone of building

phase 2 pg 752

evacuate room adjacent to fire

phase 2 pg 752

concentrate on evac. of other rooms

phase 2 pg 752

move occupant to predetermined safe area

phase 2 pg 752

take medical charts/records with patients if moved

phase 2 pg 752

facility lockdown, limit movement of unwanted person

phase 2 pg 752

letter/email to confirm inspection.


Phone call one day earlier,

inspection scheduling pg 752

turn off all equipment

employee/occupant duties pg 748

close doors and windows

employee/occupant duties pg 748

check essential safety shutdown functions

employee/occupant duties pg 748

provide info. to IC through the monitor on action taken

employee/occupant duties pg 748

ensure visitors are accounted for and evac.

employee/occupant duties pg 748

ensure compliance with posted occ. load

no notice inspection pg 731

look for locked block obstructed exits

no notice inspection pg 731

investigate public complaint

no notice inspection pg 731

1.5 Feet

Intimate space pg 727

4 feet

personal space pg 727

12 feet

social space pg 727

25 feet

public space pg 727