Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
30 Cards in this Set
- Front
- Back
PERS-451
|
NAVY PERSONNEL COMMAND
|
|
NAVPERS 1070/602W (7-72)
|
DEPENDENCY APPLICATION/ RECORD OF EMERGENCY DATA
|
|
NAVPERS 1740/6 (9-06)
|
FAMILY CARE CERTIFICATE
|
|
NAVPERS 1070/604
|
ENLISTED QUALIFICATION HISTORY
|
|
CRO PROVIDES LOA WITHIN HOW MANY DAYS OF REPORTING
|
10 DAYS
|
|
MARFOR STAFFING GOAL DURING WARTIME
|
80-95%
|
|
CASUALTY RECIVING AND TREATMENT SHIPS (CRTS)
|
84 PERSONNEL
LEVEL 2 HSS |
|
CONSTRUCTION BATTALION UNITS
|
LEVEL 1 HSS
|
|
WHO MANAGES THE OPERATION BUDGET
|
NOMI
|
|
BSO-18 IS UNDER THE OPERATIONAL CONTROL OF WHO
|
BUMED
|
|
FUNCTIONAL CODE A (FAC A)
|
ID'S NEED FOR SPECIAL CONSIDERATION IN PERSONNEL DETAILING FOR MANPOWER REQUIRMENTS ( FILLED BY ACTIVE DUTY)
|
|
ROUTINE
|
READY TO DEPLOY WITHIN 5 DAYS
|
|
SURGE
|
READY TO DEPLOY WITHIN 30 DAYS
|
|
EMERGENCY
|
READY TO DEPLOY WITHIN 120 DAYS
|
|
C1
|
FULLY MISSION CAPABLE
|
|
C2
|
SUBSTANTILLY COMBAT READY WITH MINOR DEFICIENCIES
|
|
C3
|
MAJOR DEFICIENCIES; STILL PERFORM MISSION
|
|
C4
|
UNABLE TO PERFORM WARTIME MISSION UNLESS GIVEN RESOURSES AND TRAINING
|
|
C5
|
UNABLE TO PERFORM WARTIME MISSION; NOT MISSION CAPABLE
|
|
BSO-27
|
ROUTINE
|
|
BSO-18
|
SURGE
|
|
T-AH ROUTINE
|
250 BED CONFIG.
|
|
T-AH SURGE
|
30 DAYS; 500 BED CONFIG
|
|
T-AH EMERGENCY
|
120 DAYS; 1000 BED CONFIG.
|
|
EMF ROUTINE
|
2 EMF SYSTEMS MAINTATINED FOR 1 YEAR; 500 BEDS
|
|
EMF SURGE
|
3 ACTIVE DUTY EMF MAINTATINED FOR 1 YEAR; 500 BEDS; 30DAYS
|
|
EMF EMERGENCY
|
EMF MOST RECENTLY RELEASED FROM ROUTINE; 500 BEDS; 120DAYS
|
|
FDMU(PREVMED UNIT) ROUTINE
|
2 MAINTAIN "READY FDMU"; 6 MONTH ROTATION
|
|
FDMU(PREVMED UNIT) SURGE
|
2 MAINTAIN "SURGE READY", PREDEPLOYMENT TRAINING 6 MONTHS; 30 DAYS
|
|
FDMU(PREVMED UNIT) EMERGENCY
|
2 MAINTAIN "EMERGENCY SURGE"; DEPLOY 60 DAY NOTIFICATION
|