Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
74 Cards in this Set
- Front
- Back
State the composition of the Project code.
|
Alpha/alpha/numeric.
|
|
What FAD is assigned to most fleet operating activities?
|
FAD II or III
|
|
Aircraft repair usage statistics are used by the supply department for what purpose?
|
Usage statistics justify stocking replenishment parts.
|
|
What are the two types of part numbers?
|
Definitive and non-definitive.
|
|
What is the correct nomenclature for what is commonly referred to as the “manufacturer’s code?”
|
Commercial and Government Entity Code (CAGE).
|
|
What term is used for a part, component, or system in which the requisitioned part is used?
|
Next higher assembly.
|
|
What are the two primary technical manuals used by the maintenance technician to order replacement parts?
|
The illustrated parts breakdown (IPB) and the maintenance instruction manual (MIM).
|
|
What information is contained in the "Introduction" of the IPB?
|
General information and instructions for using the publication.
|
|
What part of the IPB contains information concerning detailed parts that make up a component?
|
The group assembly parts list.
|
|
What position(s) of the SM&R code indicate(s) the source from which you can acquire the item?
|
The first position.
|
|
Which NAVSUP publication provides cross-reference information from a reference number to its national stock number (NSN)?
|
Master Cross-Reference List (MCRL).
|
|
What NAVSUP publication provides information on exceptions to the one-for-one turn-in rule?
|
Consolidated Remain in Place List (CRIPL).
|
|
How often is the ICRL-A revised?
|
Quarterly.
|
|
What is the purpose of the Aviation Consolidated Allowance List (AVCAL)?
|
AVCAL lists the items & quantities of aeronautical material authorized to be stocked by an aircraft carrier to support the maintenance and operations of embarked aircraft.
|
|
What are the first two-digits of the nine-digit NIIN called?
|
The National Codification Bureau (NCB) code.
|
|
What two instructions describe the procedures for allowance and inventory of the AMMRL program?
|
NAVAIRINST 13650.1 for IMRL items and
NAVAIRINST 13630.1 for tailored outfitting list (TOL) items. |
|
How is Naval Air Systems Command (NAVAIRSYSCOM) involved in the AMMRL program?
|
NAVAIRSYSCOM exercises overall program management and authority.
|
|
What are the five major sections of the IMRL?
|
Employment data, change list, index, main body, and the activity inventory record.
|
|
What section of the IMRL lists all of the items allowed for the activity along with allowance quantities?
|
The IMRL main body.
|
|
How often is the IMRL Activity Inventory Record reissued?
|
It is reissued in its entirety each month.
|
|
What work center is the point-of-contact for parts and material at the organizational maintenance level?
|
Material control.
|
|
DD form 1348, Standard Form 44, and an identiplate (DD 1896 or 1897) are all issued as part of what package?
|
A flight packet.
|
|
What level of maintenance orders the greater volume of parts?
|
Intermediate level.
|
|
The Individual Component Repair List (ICRL) is used by what work center to determine the repair capability of a component received by supply?
|
Aeronautical material screening unit (AMSU).
|
|
What are the two sections of the Aviation Support Division/Supply Support Center (ASD/SSC)?
|
Supply Response Section (SRS) and Component Control Section (CCS).
|
|
If a part is listed in the CRIPL, the maintenance activity has how many hours after receipt of the replacement component to furnish the unserviceable part?
|
24 hours.
|
|
What items are maintained in the pre-expended bins (PEBs)?
|
High usage, low-cost, maintenance-related consumable materials that have a minimum demand frequency of three per month.
|
|
How often does supply review stock records for the PEB?
|
Quarterly.
|
|
What section of Aviation Support Division/Supply
Support Center (ASD/SSC) manages local repair cycle assets (LCRA)? |
Component control section (CCS).
|
|
How many workload priorities can be assigned to a LRCA storage unit?
|
Four.
|
|
If a squadron requisitions an NMCS component and the only other part on station is in the IMA for repair, what priority will be assigned?
|
Priority 1, and the part would be designated "EXREP" or expeditious repair.
|
|
What is the purpose of an illustrated parts breakdown?
|
To allow supply and maintenance personnel to identify and order replacement parts for aircraft or equipment
|
|
Information from which of the following sources is used by supply department personnel as justification for stocking material?
|
Usage statistics
|
|
What type of code identifies the agent or agency that has design control over an item?
|
CAGE
|
|
What section in an IPB contains general information and instructions for using the publication?
|
Introduction
|
|
Besides the introduction, each IPB includes what basic information?
|
Table of contents or alphabetic index
Group assembly parts list Numerical index |
|
What section of the IPB contains an explanation of the source or SM&R codes used in the IPB?
|
Introduction
|
|
What listing in the IPB lists aircraft assemblies and identifies the pages or figure numbers where the assemblies are shown in the IPB?
|
Alphabetical index
|
|
What section of the IPB contains a description of a component listed in the IPB?
|
Group assembly parts list
|
|
What section of the IPB lists supplementary handbooks to which you may refer?
|
Introduction
|
|
What is the purpose of an index number in an IPB?
|
To establish the relationship between parts in the illustration and the corresponding parts list
|
|
An SM&R code is an alphanumeric code containing how many digits?
|
Five or six.
|
|
What part of a part’s SM&R code indicates how the part is to be acquired?
|
Source code only
|
|
What position of the SM&R code identifies the maintenance level assigned to completely repair an item?
|
Fourth
|
|
What Aviation Supply Office (ASO) publication contains a complete list of Navy-managed material that is classified as mandatory turn-in repairables (MTR)?
|
Master Repairable Item List (MRIL)
|
|
What information does the third position of an SM&R code provide?
|
The lowest maintenance level authorized to remove, replace, and use an item
|
|
What two instructions govern policies, procedures, and definitions applicable to SM&R codes?
|
NAVSUPINST 4423.14 and NAVAIRINST 4423.3
|
|
When removal of a component from an aircraft is not feasible or advisable until a replacement is on hand, its part number is listed in what document?
|
Consolidated Remain In Place List (CRIPL)
|
|
What type of material is listed in the Consolidated Remain In Place List (CRIPL)?
|
Material exempt from the one-for-one turn-in rule
|
|
The reference number on a master cross reference list refers to what number or numbers?
|
Either a manufacture’s part number, a drawing number, or a design control number
|
|
The Master Cross-Reference List (MCRL) is used to provide a cross reference between what items of information?
|
Reference number and NSN
|
|
What is the purpose of the ICRL-A?
|
To provide a list of repairables and the local IMA's capability to repair them
|
|
An ICRL-A is revised at what specified interval?
|
Quarterly
|
|
What ICRL Capability code is used for check and test only?
|
A1
|
|
Within the ICRL listing, what code is equivalent to Beyond Capability of Maintenance (BCM)-3?
|
X3
|
|
To what reference should you refer to obtain an NSN or reference number for an item when you only know the description?
|
Afloat Shopping Guide (ASG)
|
|
What is the 13–digit number called that identifies an item of material in the supply system?
|
National stock number (NSN)
|
|
What is the title of the overall program that provides the data required for effective management of support equipment at all levels of maintenance?
|
Aircraft Maintenance Material Readiness List (AMMRL) program
|
|
What command exercises overall program management for the AMMRL program?
|
NAVAIRSYSCOM
|
|
What information is provided by the first two digits in the FSC code number?
|
Manager that controls the category of material
|
|
The NSN is comprised of what total number of digits?
|
13
|
|
Which of the following acronyms identifies equipment that is required on the ground to make a system, subsystem, or end item of equipment operational?
|
SE
|
|
Within an activity, personnel in what rating normally maintain the IMRL?
|
LS
|
|
The IMRL contains how many major sections?
|
Five
|
|
At the organizational maintenance level, the point of contact for all material requirements generated by a squadron is located in what organization?
|
Material control center
|
|
What Material Condition code tells you that an item of supply is fast moving and in high demand?
|
F
|
|
To determine whether an intermediate maintenance activity has capability to test/check or repair an item, what I-level supply area screens all components turned into ASD/SSC?
|
Aeronautical Material Screening Unit (AMSU)
|
|
The Aviation Support Division/Supply Support Center (ASD/SSC) is composed of what section or sections?
|
supply response section (SRS) and
the component control section (CCS). |
|
The supply response section (SRS) limits the quantity of any item in the pre-expended bin to a supply of how many days?
|
30-days
|
|
Within an activity, what officer must approve the item of PEB stockage when it costs more than $150?
|
The commanding officer
|
|
Supply will remove an item from the PEB if there has been no demand for the item within what total period of time?
|
12 months
|
|
What is the purpose of the component control section (CCS) within the supply department?
|
To manage the LRCA at the ASD/SSC
(Aviation Support Division/Supply Support Center) |
|
A local repair cycle assets (LRCA) is assigned a workload priority. The priority assigned is one of what total number of priorities that can be assigned to the LRCA?
|
Four
|
|
An aircraft is in NMCS/PMCS status. What priority is assigned to an LRCA in support of this aircraft?
|
Priority 1
|