56 Cards in this Set

  • Front
  • Back

C1064:


For concrete with aggregates less then 3”, the thermometer must remain in the fresh concrete sample a minimum of 5 min or until the temp reading stabilizes.


True or False

False: 2-5 minutes

C1064:


The temperature measuring device must be accurate to within 0.1 Degrees.



True or False?

False: 1 degree Fahrenheit

C1064:


The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete throughout a range of?

1 degree Fahrenheit/ 30-120 degrees Fahrenheit

C1064:


A composite sample is not needed if only the temperature test is being run.



True or False?

True.

C1064:


The temperature of fresh concrete in a placement must be measured by inserting a thermometer into the top 6” of concrete.



True or False?

False- Top 3”

C1064:


The temperature of the concrete is recorded to the nearest?

1 Degree Fahrenheit

C1064:


ASTM C1064 states the container used to measure temperature of concrete must be large enough to provide at least 5” of concrete around the sensor.



True or False?

False- 3” of concrete

C1064:


Calibrate the temperature measuring device at least________, or whenever there is a question of_________.

Annually/Accuracy

C1064:


After the thermometer is placed in the concrete:


A. Gently press concrete around the thermometer.


B. Cool the surface of concrete with water.


C. Tap the side of the container 10-15 times.


D. All the above

A. Gently press concrete around the thermometer.

C1064:


According to ASTM C1064, what is the one reason to take the temperature of concrete?

To verify conformance.

C1064:


It is allowable to remove the temperature measuring devices from the freshly mixed concrete to read the temperature if you cannot see the reading.


True or False?

False- Do not remove the thermometer while reading the temp.

C1064:


The temperature of concrete may be measured in a wheelbarrow.


True or False?

True.

C1064:


The temperature of concrete may be measured in a wall form.


True or False?

True.

C1064:


What must be done to the sample container prior to sampling the concrete?

Dampen the container with water.

C1064:


How long must the temperature measuring device remain in the freshly mixed concrete?

2-5 minutes

C1064:


After the temperature of the concrete is read, what is then required?

Report the temperature.

C1064:


A maximum temperature of freshly mixed concrete is specified in Test Method C1064.


True or False?

False

C1064:


The sample of concrete used for temperature determination must be rodded 25 times.


True or False?

False

C172:


The maximum allowable time between obtaining the first and last portions of the composite sample may not exceed 5 minutes.


True or False?

False- 15 minutes

C172:


Start molding specimens for strength tests within 30 minutes after fabricating the composite sample.


True or False?

False- 15 minutes

C172:


The composite concrete sample must be protected from sun, wind, contamination and rapid evaporation.


True or False?

True

C172:


If the concrete contains aggregate larger than those that are appropriate for a size of mold or equipment used, the sample should be wet-sieved before making the test.


True or False?

True

C172:


If the concrete contains aggregate larger than those that are appropriate for a size of mold or equipment used, the sample should be wet-sieved before making the test.


True or False?

True

C172:


The composite sample should not be remixed before beginning any tests.


True or False?

False

C172:


Sampling should normally be performed, as the concrete is discharged from the mixer.


True or False?

True

C172:


If the concrete contains aggregate larger than those that are appropriate for a size of mold or equipment used, the sample should be wet-sieved before making the test.


True or False?

True

C172:


The composite sample should not be remixed before beginning any tests.


True or False?

False

C172:


Sampling should normally be performed, as the concrete is discharged from the mixer.


True or False?

True

C172:


ASTM Method C172 includes sampling from stationary mixers, paving mixers, truck mixers, agitators, and non-agitating equipment.


True or False?

True

C172:


After sampling is completed, start the tests for slump and air content within:


A. 2 1/2 min


B. 10 min


C. 15 min


D. None of the above

A. 2 1/2 min

C172:


If the concrete contains aggregate larger than those that are appropriate for a size of mold or equipment used, the sample should be wet-sieved before making the test.


True or False?

True

C172:


The composite sample should not be remixed before beginning any tests.


True or False?

False

C172:


Sampling should normally be performed, as the concrete is discharged from the mixer.


True or False?

True

C172:


ASTM Method C172 includes sampling from stationary mixers, paving mixers, truck mixers, agitators, and non-agitating equipment.


True or False?

True

C172:


After sampling is completed, start the tests for slump and air content within:


A. 2 1/2 min


B. 10 min


C. 15 min


D. None of the above

A. 2 1/2 min

C172:


In any case, do not obtain samples until:


A. All water and admixtures have been added to the concrete.


B. 200 revolutions of the drum have been obtained.


C. 1/2 of the water has been added.


D. None of the above.

A. All water and admixtures have been added to the concrete.

C172:


If the concrete contains aggregate larger than those that are appropriate for a size of mold or equipment used, the sample should be wet-sieved before making the test.


True or False?

True

C172:


The composite sample should not be remixed before beginning any tests.


True or False?

False

C172:


Sampling should normally be performed, as the concrete is discharged from the mixer.


True or False?

True

C172:


ASTM Method C172 includes sampling from stationary mixers, paving mixers, truck mixers, agitators, and non-agitating equipment.


True or False?

True

C172:


After sampling is completed, start the tests for slump and air content within:


A. 2 1/2 min


B. 10 min


C. 15 min


D. None of the above

A. 2 1/2 min

C172:


In any case, do not obtain samples until:


A. All water and admixtures have been added to the concrete.


B. 200 revolutions of the drum have been obtained.


C. 1/2 of the water has been added.


D. None of the above.

A. All water and admixtures have been added to the concrete.

C172:


No samples shall be taken before_______ or after________ of the batch has been discharged.


A. 10% or after 90%


B. 20% or after 90%


C. 20% or after 80%


D. None of the above

A. 10% or after 90%

C172:


When strength tests are to be made, the minimum size of the composite sample shall be:


A. 1/4 cubic foot


B. 1 cubic foot


C. Any convenient size


D. 1 wheelbarrow

B. 1 cubic foot

C172:


Sample the concrete from the chute of a truck mixer by:


A. Raising the chute to stop the flow and scoop concrete from there into the slump cone and cylinder molds.


B. Passing a receptacle completely through the discharge stream or by completely diverting the discharge into the sample container.


C. Holding a shovel in the flow and direct half into a bucket.


D. None of the above.

B. Passing a receptacle completely through the discharge stream or by completely diverting the discharge into the sample container.

C172:


Sample the concrete from the chute of a truck mixer by:


A. Raising the chute to stop the flow and scoop concrete from there into the slump cone and cylinder molds.


B. Passing a receptacle completely through the discharge stream or by completely diverting the discharge into the sample container.


C. Holding a shovel in the flow and direct half into a bucket.


D. None of the above.

B. Passing a receptacle completely through the discharge stream or by completely diverting the discharge into the sample container.

C. Two or more regular

C. Two or more regularly spaced intervals during discharge of the middle portion of the batch.

C172:


Sample the concrete from the chute of a truck mixer by:


A. Raising the chute to stop the flow and scoop concrete from there into the slump cone and cylinder molds.


B. Passing a receptacle completely through the discharge stream or by completely diverting the discharge into the sample container.


C. Holding a shovel in the flow and direct half into a bucket.


D. None of the above.

B. Passing a receptacle completely through the discharge stream or by completely diverting the discharge into the sample container.

C. Two or more regular

C. Two or more regularly spaced intervals during discharge of the middle portion of the batch.

C172:


The elapsed time between obtaining the first and final portions of the composite sample, according to ASTM C172, shall not exceed:


A. 10 min


B. 20 min


C. 30 min


D. None of the above.

D. None of the above.

C172:


When sampling from a stationary mixer, the batch must be sampled at_____ or more regularly spaced intervals.

2

C172:


When sampling from a stationary mixer, the batch must be sampled at_____ or more regularly spaced intervals.

2

C172:


When sampling from a paving mixer, obtain samples from at least_____ different portions of the pile and combine them into one composite sample for test purposes.

5

C172:


When sampling from a revolving drum mixer, sample the concrete by collecting_____ or more portions taken at regularly spaced intervals during discharge of the middle portion of the batch.

2

C172:


When concrete contains aggregate larger than that permitted for a particular test method, the sample of concrete must be_______ before making a test.

Wet-sieved

C172:


Fresh concrete to be sampled at the job site should be sampled from?

Two or more regularly spaced intervals during discharge of the middle portion of the batch.