• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/48

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

48 Cards in this Set

  • Front
  • Back

ASTM 1064: Concrete cover should be at least _____.

3 inches (175 cm)

ASTM 1064: Containers shall be large enough to provide ____ of cover in all directions around the sensor.

3 inches (175 cm)

ASTM 1064: Temperature measuring devices shall be capable of measuring temperature to +/- ___° through a range of ___° to ___°.

1°F (0.5°C), 30 to 120 (0° to 50°C)

ASTM 1064: All TMDs shall be readable and accurate to +/- ___ at the verification points.

0.5°F (0.2°C)

ASTM 1064: TMDs should be calibrated ____ or ____.

Annually or whenever there is a question of accuracy

ASTM 1064: Leave the TMD in the concrete for at least ____ but not more than ____.

2 minutes, 5 minutes

ASTM 1064: Read and record the temperature to the nearest ____°F.

1°F (0.5°C)

True or False: ASTM 1064: The temperature of the concrete may be measured in a wheelbarrow.

True

True or False: ASTM 1064: The temperature of the concrete may be measured in wall form.

True

True or False: ASTM 1064: A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temperature.

False

ASTM 1064: What must be done to the sample container prior to sampling the concrete?

Dampen the container

ASTM 1064: What must be done to the concrete surrounding the temperature measuring device after the device is submerged in fresh concrete?

Gently press the concrete around the device to ensure concrete is touching all sides of the TMD.

ASTM 1064: After the temperature of the concrete is read, what is then required?

Record the reading

ASTM 1064: What is one reason to take the temperature of the concrete?

To verify conformance to requirements

True or False: ASTM 1064: A maximum temperature of freshly mixed concrete is specified in ASTM C1064.

False

ASTM 1064: What special procedures are required when taking the temperature of concrete containing large size coarse aggregate (over 3 in. [75 mm.])?

Wait up to 20 minutes

True or False: ASTM 1064: The sample of concrete used for temperature determination must be rodded 25 times.

False

ASTM 138: The diameter of the tamping rod used in this test method is ___.

5/8" (16mm)

ASTM 138: What is the required shape of the tamping end of the rod?

Hemispherical

ASTM 138: What is the minimum frequency of the vibrator used in this test method?

7000 vibrations/minute

ASTM 138: The outside diameter or side dimension of the vibrating element must be at least ___ but not greater than ___.

0.75 in (19mm), 1.5 in (38mm)

True or False: ASTM 138: A plastic container can be used for the measure in this method.

False

ASTM 138: What is the minimum thickness of a metal strike-off plate?

1/4 in (6mm)

ASTM 138: What is the minimum thickness for a glass or acrylic strike-off plate?

1/2 in (12mm)

ASTM 138: What is the specified weight of the mallet used in measures that are 0.5 ft^3 [14L] or smaller?

1.25 +/- 0.5 Lb (600 +/- 200 g)

ASTM 138: Measures other than air meter bowls used for this test must conform to ASTM ____.

C 29

ASTM 138: Air meter bowls used for this test must Conform to ASTM ___ and be calibrated for volume according to ASTM ___.

C 231, C 29/C29M

ASTM 138: The concrete sample must be obtained in accordance with what ASTM method?

C 172

ASTM 138: What method of consolidation must be used when the slump is greaterthan 3 in. [75 mm]?

Rodding

ASTM 138: What method of consolidation must be used when the slump is less than 1 in. [25 mm]?

Vibration

ASTM 138: If rodding is the method of consolidation being used, the measure must be filled in how many layers?

3

ASTM 138: For a measure of 0.5 ft^3 [14 L], what is the required number of strokes of the tamping rod for consolidation of each layer?

25

ASTM 138: When rodding in the middle and the top layers, the tamping rod should penetrate into the layer below approximately ___.

1 in. (25 mm)

ASTM 138: If vibration is the method of consolidation, the measure must be filled in ___ approximatly equal layers.

2

ASTM 138: If after consolidation of the final layer, the concrete level is 1/2 in. (13 mm) above the top of the measure, what should be done?

Remove excess with a trowel or scoop

ASTM 138: After consolidation of the final layer, an excess of concrete ___ above the top of the measure is considered optmimum.

1/8 in

ASTM 138: After completing the strike-off procedure, what must be done before weighing the measure and sample?

Clean around the edge

ASTM 231: The pressure method of determining air content can be used on concrete containing ___ ___ aggregate.

Relatively dense

ASTM 231: The pressure method of determining air content cannot be used on concrete containing the following types of aggregate: ___, ___, ___.

light weight, air cooled blast furnace slags, and aggregates of high porosity

ASTM 231: What is the minimum allowable capacity of the measuring bowl used in this test method?

0.2 ft^3

ASTM 231: What are the required characteristics of the tamping rod used in this test?

Height of measure + 4in to 24 inches long, 5/8th in diameter, hemispherical tip

ASTM 231: What is the specified size of the mallet required for this test method when the measuring bowl has a capacity of 0.5ft^3 (14 L) or less?

1.25 +/- 0.5 lb

ASTM 231: The sample of concrete used for this test is to be obtained in accordance with what ASTM standard?

C 172

ASTM 231: The maximum size aggregate allowed for this tut method is ___.

2in.

ASTM 231: If the concrete contains aggregate larger than the maximum allowed for this test, the sample must be ___.

wet sieved

ASTM 231: If the concrete sample is to be consolidated by rodding, the measure is filled in ___ layers.

3

ASTM 231: If the concrete sample is to be consolidated by vibration, the measure is filled in ___ layers.

2

ASTM 231: When rodding the concrete sample, what is the specified number if strokes required for each layer?

25