Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
10 Cards in this Set
- Front
- Back
- 3rd side (hint)
Supply piping for hazardous production materials having a health hazard ranking of 3 or 4 shall have ____ connections.
(A) soldered (B) brazed (C) threaded (D) welded |
(D) welded
|
1406.3.2 |
|
A continuous gas-monitoring system shall be provided when dispensing occurs, and flammable gases or vapors may be present in quantities in excess of __ percent.
(A) 5 (B) 15 (C) 20 (D) 25 |
(C) 20
|
1406.3.3 |
|
This process piping inspection shall include a determination that the piping size material and installation meet the requirements of this code ____ inspection.
(A) final piping (B) excavation (C) rough piping (D) special |
(C) rough piping
|
1405.2.2 |
|
Straining or bending pipe is an acceptable method of installing process piping ______.
(A) provided it is low-pressure piping (B) only if the piping is clamped secured every 3 feet (C) anytime (D) process piping shall not be bent or strained |
(D) process piping shall not be bent or strained
|
1404.1 |
|
Excavations required for the installation of underground process piping shall be kept open until _____.
(A) all underground piping is installed (B) it has been inspected and approved by the Authority Having Jurisdiction (C) it has been tested (D) all expansion of the pipe has taken place |
(B) it has been inspected and approved by the Authority Having Jurisdiction
|
1405.1 |
|
Process piping being hydraulically tested must be tested at not less than ______.
(A) 100 psi (B) 100 percent of operating pressure (C) one and one-half times the maximum operating pressure (D) twice the maximum operating pressure |
(C) one and one-half times the maximum operating pressure
|
1405.2.2 |
|
When testing a process piping system with air, the pressure must be at least ______.
(A) 100 psi (B) 100 percent of the maximum operating pressure (C) 110 percent of the maximum operating pressure (D) twice the maximum operating pressure |
(C) 110 percent of the maximum operating pressure
|
1405.2.2
|
|
Test pressure shall be held for a length of time acceptable to the Authority Having Jurisdiction but in no case for less than ____.
(A) 15 minutes (B) 30 minutes (C) 1 hour (D) 24 hours |
(B) 30 minutes
|
1405.2.2 |
|
All liquid HPP waste or drainage shall be installed in accordance with the _____.
(A) NFPA codes (B) Plumbing Code (C) Building Code (D) Fire Code |
(B) Plumbing Code
|
1406.2 |
|
In addition to the requirements of the code, HPP gases shall also comply with ______.
(A) the Building Code (B) the Fire Code (C) Utility Codes (D) Building Standards |
(B) the Fire Code
|
1406.3 |