Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
48 Cards in this Set
- Front
- Back
What is sustainable Workflow?
|
A workflow designed to work as planned for the foreseeable future.
|
|
What do sustainable workflow need tolerances?
|
Accommodate fluctuation of demand and production, not just for ideal situation. We need to plan for chaos.
|
|
What is downtime?
|
Anytime when equipment is not producing sellable products
|
|
What are some examples of downtime?
|
make-ready,
setup, breakdown, maintenance |
|
What is capacity?
|
Amount of production a workflow or equipment is capable of producing in a given time frame.
|
|
Why is capacity hard to calculate?
|
Must account for:
different job constraints, allowance for downtime, human variables |
|
How often should capacity calculation be revisited and why?
|
Revisited regularly to tighten or relax the tolerances.
Tighten to fit another job. Relaxed for more flexible production movement. |
|
What does overworking equipment mean?
|
Skipping schedule maintenance, pushing it to the limit.
|
|
What does overworking personnel mean?
|
People working in ideal capacity all the time.
|
|
What is load balancing?
|
Splitting the work among group of employees, according to their capacity, so it function best way possible.
|
|
What is scheduling?
|
When a particular job will be processed through each equipment work centre to meet delivery date
|
|
What is ideal schedule?
|
When all equipment are kept busy at its full capacity.
|
|
What does it mean by linear workflow?
|
Where one action follow another, at least to some degree.
|
|
What are the 3 ways to meet deadline when it does not follow schedule as planned?
|
1. overtime
2. split production time 3. outsource |
|
what are the variable that affect scheduling?
|
makeready
ganging jobs ink changeovers |
|
what is slack time?
|
anytime when there's no work or scheduled time for the piece of equipment
|
|
What does a gantt chart do?
|
display the amount and timing of a job
Shows you slack time or areas that's under capacity |
|
what are the 4 types of scheduling?
|
forward
backward load board auto schedule |
|
what is forward scheduling?
|
you work with the start time and schedule from start to finish
|
|
what is backward scheduling?
|
when you work from the due date
|
|
what the most suitable schedule when you have tight deadlines
|
backwards
|
|
what is the most suitable if you have a flexible schedule?
|
forward
|
|
what is load board?
|
amount of work for specific department or equipment, are placed under headings and are added up
|
|
what is auto scheduling?
|
it needs lot of data, more suitable for computer integrated manufacturer. MIS report to the system, get update in real time, create schedule for jobs based on specifications
|
|
what is automation?
|
operated and control without the need for human interaction. Production and operations can run alone
|
|
what is physical operation?
|
hardware that physically does the work
|
|
what are examples of physical operation?
|
servos, motors, switches installed in the equipment
|
|
what is electronic automation?
|
done by replace or augmenting (better) human with controllers, processes can be completely electronic
|
|
What are the 4 levels of automation?
|
1. manual
2. assisted decision 3. automated decision 4. complete automation |
|
What is manual automation?
|
human make all the decision and options, gives the instructions implemented by machine
|
|
what is assisted decision?
|
human and system come up with options, human makes the decision and issue instructions, machine implement
|
|
what is automated decision?
|
system comes up with the options and decision, but human have the final say
|
|
what is complete automation?
|
system recieves input, comes up with options based on human preset rules, carry out the action
|
|
what are the advantages of automation?
|
better quality
more efficient (repeatability) handle more work safer save money |
|
Why do we need installation time line?
|
to avoid surprises, reduce confusion if change occurs
|
|
what does implementation of technology involve?
|
research area that needs automation,
research technology cost benefit analysis installation training bug fixes |
|
what are action scripts?
|
record steps from one file and implement the same step onto another
|
|
what is OS X automator?
|
free mac utility to create simple workflow to automate tasks using applications and software on your computer. it can only direct tasks
|
|
What are the limitation of OS X automator?
|
passing the variables
little decision making ability (ie. if then else) |
|
what is apple script?
|
text scripting language for apple computers
|
|
what's the difference between scripting and program language?
|
script is simpler and does not run alone, it commands other apps to do the work.
|
|
what are the advantages of applescript?
|
it can work with variable, if then else decision, loops, functions
|
|
What the options for implementing an automation process?
|
Build - piece together system from different vendors to create a solution
Buy - talk to vendor to create a solution for you |
|
What's the general rule for implementing an automation solution?
|
The more unique your workflow, the harder it is to find a solution.
The more standardize, generalized your workflow is, the easier to find the solution |
|
What are the physical components of the OnStar?
|
sensors,
servos, software |
|
What is the HEIRES?
|
Heidelberg remote services
|
|
What does the HEIRES do?
|
allow Heidelberg to remote access production control on the press to determine what problems you have
it connect service expert to solve your problem |
|
What is the advantage of HEIRES?
|
- It can solve the problem 90% of the time without sending in repair technician
- reduces downtime |