• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/48

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

48 Cards in this Set

  • Front
  • Back
What is sustainable Workflow?
A workflow designed to work as planned for the foreseeable future.
What do sustainable workflow need tolerances?
Accommodate fluctuation of demand and production, not just for ideal situation. We need to plan for chaos.
What is downtime?
Anytime when equipment is not producing sellable products
What are some examples of downtime?
make-ready,
setup,
breakdown,
maintenance
What is capacity?
Amount of production a workflow or equipment is capable of producing in a given time frame.
Why is capacity hard to calculate?
Must account for:
different job constraints, allowance for downtime,
human variables
How often should capacity calculation be revisited and why?
Revisited regularly to tighten or relax the tolerances.

Tighten to fit another job. Relaxed for more flexible production movement.
What does overworking equipment mean?
Skipping schedule maintenance, pushing it to the limit.
What does overworking personnel mean?
People working in ideal capacity all the time.
What is load balancing?
Splitting the work among group of employees, according to their capacity, so it function best way possible.
What is scheduling?
When a particular job will be processed through each equipment work centre to meet delivery date
What is ideal schedule?
When all equipment are kept busy at its full capacity.
What does it mean by linear workflow?
Where one action follow another, at least to some degree.
What are the 3 ways to meet deadline when it does not follow schedule as planned?
1. overtime
2. split production time
3. outsource
what are the variable that affect scheduling?
makeready
ganging jobs
ink changeovers
what is slack time?
anytime when there's no work or scheduled time for the piece of equipment
What does a gantt chart do?
display the amount and timing of a job
Shows you slack time or areas that's under capacity
what are the 4 types of scheduling?
forward
backward
load board
auto schedule
what is forward scheduling?
you work with the start time and schedule from start to finish
what is backward scheduling?
when you work from the due date
what the most suitable schedule when you have tight deadlines
backwards
what is the most suitable if you have a flexible schedule?
forward
what is load board?
amount of work for specific department or equipment, are placed under headings and are added up
what is auto scheduling?
it needs lot of data, more suitable for computer integrated manufacturer. MIS report to the system, get update in real time, create schedule for jobs based on specifications
what is automation?
operated and control without the need for human interaction. Production and operations can run alone
what is physical operation?
hardware that physically does the work
what are examples of physical operation?
servos, motors, switches installed in the equipment
what is electronic automation?
done by replace or augmenting (better) human with controllers, processes can be completely electronic
What are the 4 levels of automation?
1. manual
2. assisted decision
3. automated decision
4. complete automation
What is manual automation?
human make all the decision and options, gives the instructions implemented by machine
what is assisted decision?
human and system come up with options, human makes the decision and issue instructions, machine implement
what is automated decision?
system comes up with the options and decision, but human have the final say
what is complete automation?
system recieves input, comes up with options based on human preset rules, carry out the action
what are the advantages of automation?
better quality
more efficient (repeatability)
handle more work
safer
save money
Why do we need installation time line?
to avoid surprises, reduce confusion if change occurs
what does implementation of technology involve?
research area that needs automation,
research technology
cost benefit analysis
installation
training
bug fixes
what are action scripts?
record steps from one file and implement the same step onto another
what is OS X automator?
free mac utility to create simple workflow to automate tasks using applications and software on your computer. it can only direct tasks
What are the limitation of OS X automator?
passing the variables
little decision making ability (ie. if then else)
what is apple script?
text scripting language for apple computers
what's the difference between scripting and program language?
script is simpler and does not run alone, it commands other apps to do the work.
what are the advantages of applescript?
it can work with variable, if then else decision, loops, functions
What the options for implementing an automation process?
Build - piece together system from different vendors to create a solution

Buy - talk to vendor to create a solution for you
What's the general rule for implementing an automation solution?
The more unique your workflow, the harder it is to find a solution.
The more standardize, generalized your workflow is, the easier to find the solution
What are the physical components of the OnStar?
sensors,
servos,
software
What is the HEIRES?
Heidelberg remote services
What does the HEIRES do?
allow Heidelberg to remote access production control on the press to determine what problems you have
it connect service expert to solve your problem
What is the advantage of HEIRES?
- It can solve the problem 90% of the time without sending in repair technician
- reduces downtime