CAP corrective action program |
Identify, document, and correct deficiencies. Sage and comply with NRC code. |
|
Equipment operator duties |
-Take necessary actions reporting condition to supervisor Initiate issue report (IR) |
|
Issue report (IR) |
configuration control Conditions that effect safety, and efficient operations. |
|
Action tracking |
Means to identify and track equipment and process deficiencies in plant |
|
Issue report (IR) |
Identifies, trakcs, and resolves a deficiency in the plant that must be screened. |
|
Screening |
All IRs are properly classified, prioritized, and categorized. |
|
Work request three categories |
1) Modifications- planned change in plant design 2) Minor maintenance 3) work request maintenance- detailed maintenance instructions |
|
Condition based monitoring |
Process of monitoring non-impact equipment discrepancies that are not cost effective to repair. |
|
Inconsequential deficiency |
Condition that poses no threat to operation of equipment, is not safety hazard. |
|
Inconsequential leak |
A leak that can be contained or cleaned to prevent problems. |
|
Who should be notified regarding any issue |
- Notify management or operations - find out if (IR) should be filled |
|
Operator work-around |
An obstacle provided in order to complete a task in safe manner. -obstacle to safe plant ops - has potential to complicate emergency response or contribute to the significance of a plant transiet.
|
|
Operator challenge |
An equipment or program deficiency that provides an obstacle to normal plant operations. -obstacle to normal plant operations |
|
Work around process |
-Identify -Write IR -Forward copies to work around coordinator following WAB meeting -work-around board will review the operator worm arounds monthly for impact on operations. |
|
Who is responsible for identifying issues and reporting as IR process |
All plant personell |