• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/15

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

15 Cards in this Set

  • Front
  • Back

CAP corrective action program

Identify, document, and correct deficiencies. Sage and comply with NRC code.

Equipment operator duties

-Take necessary actions reporting condition to supervisor


Initiate issue report (IR)


Issue report (IR)

configuration control


Conditions that effect safety, and efficient operations.

Action tracking

Means to identify and track equipment and process deficiencies in plant

Issue report (IR)

Identifies, trakcs, and resolves a deficiency in the plant that must be screened.

Screening

All IRs are properly classified, prioritized, and categorized.

Work request three categories

1) Modifications- planned change in plant design


2) Minor maintenance


3) work request maintenance- detailed maintenance instructions

Condition based monitoring

Process of monitoring non-impact equipment discrepancies that are not cost effective to repair.

Inconsequential deficiency

Condition that poses no threat to operation of equipment, is not safety hazard.

Inconsequential leak

A leak that can be contained or cleaned to prevent problems.

Who should be notified regarding any issue

- Notify management or operations


- find out if (IR) should be filled


Operator work-around

An obstacle provided in order to complete a task in safe manner.


-obstacle to safe plant ops


- has potential to complicate emergency response or contribute to the significance of a plant transiet.


Operator challenge

An equipment or program deficiency that provides an obstacle to normal plant operations.


-obstacle to normal plant operations

Work around process

-Identify


-Write IR


-Forward copies to work around coordinator following WAB meeting


-work-around board will review the operator worm arounds monthly for impact on operations.



Who is responsible for identifying issues and reporting as IR process

All plant personell