• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/23

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

23 Cards in this Set

  • Front
  • Back
Name Eight Purposes for the Wetlands Protection Act
1) protect public and private water supply
2) protect ground water supply
3) flood control prevention
4) storm damage prevention
5) prevention of pollution
6) protection of land containing shellfish
7) protection of fisheries
8) protection of wildlife habitat
What are some areas subject to protection under the wetlands protection act?
A) any bank, freshwater wetland, coastal wetland, beach, dune, flat, marsh or swamp bordering the ocean or any estuaary, creek, river, stream, pond, or any lank
b) land under any of hte water bodies listed above
c) land subject to tidal action
d) land subject to coastal storm flowage
e) land subject to flooding
f) riverfront area
A riverfront area is a land area ___________ from a perennial river or stream
200 feet
how is a riverfront area measured?
horizontally
t/f a riverfront area has a buffer
f
t/f a riverfront area is a wetland resource area
t
What type geographical structures count as coastal wetlands?
- salt marshes
-beach
-dune
coastal bank
-flat
land under the ocean
-land subject to coastal storm flowage
A buffer zone extends ____________ horizontally outward from the boundary of any BW
100 feet
What type activities are subject to regulation
any activity proposed or undertaken within the area of a wetland
What are some ways someone can alter a wetland?
change drainage characteristics, flushing, salinity, flow pattern, sedimentation patterns, etc.
lowering water level
destruction of vegetation
change in water temp, BOD, other physical, biological or chemical characteristics of receiving water
activities outside the jurisdiction of a wetland are not subject to regulation unless and until that activity
actually alters a wetland
What are some minor exemptions in the buffer zone?
1) installation of monitoring wells
2) exploratory borings
3) sediment sampling
4) surveying
What are some questions to ask pertaining to wetlands?
- are there any wetalnd resources areas on the site or within 100 feet of the site?
- is there a perennial river within 200 feet?
- will the work dredge, fill, remove, or alter a wetland resource area
- access possible without a wetland crossing
emergency request must specify what _________________ of the state or town will perform the project or has ordered the work
agency of the state
emergency requests can only be made for
public health safety
emergency work not to exceed ______________ for approved Immediate Response Action (IRA)
60 days
Once a request for emergency certification has been made pursuant work that commenced before such filing may continue pending a decision on the request by the _________________________
conservation commission
What are the four steps of the permitting procedures
1) determination of applicability
2) ANRAD
3) Notice of Intent
4) Fees
any person who proposes to do work that will remove, fill, dredge or alter any area subject to protection shall file a
notice of intent
Alternatives Analysis shall include an alternative that does not alter
wetland which will provide baseline data for evaluating other alternatives
Alternatives Analysis shall include an assessment of alternatives
to both temporary and permanent impacts to wetlands
limited projects shall be designed, implemented, operated and maintained to avoid impacts to
resource areas
Max Extent Practicable includes
hydrological changes minimized
BMPs to prevent erosion
mitigating measures that contribute to the protection of wetland interests
compensatory flood storage required
no restriction of flows & no increase in flood stage or velocity
- temporary strucutres roads removed within 30 days of completion
-substantial restoration of resource areas
-work in resource areas only when ground is frozen, dry or otherwise stable