• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/15

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

15 Cards in this Set

  • Front
  • Back

How many stories and what construction?

1 to 2 cbs or reinforce concrete

The hazards depend on? 3 things

Type of work performed


Product produced


Protection devices installed

What will determine the type of attack and fire lines required?

How involved these structures are

Pumper oic will need to consider?

Private protection devices


Fire lines


Type of attack

On arrival, if these structures are fully involved or has vented through the roof what will be used?

Defensive



Large handline


Masterstreams



If fire is isolated to part of structure what will be used?

Offensive



Quick attack with preconnect 1 3/4 line

Aerial oic shall consider?

Searchband rescue


Ventilation


Forcible entry


Lights


Aerial devices

Ventilation is difficult due to?

Design and type of construction

When will you use a ladder pipe?

Assist with ff gaining access to roof with ventilation equipment



Protect exposures and attack the fire after roof collapse

Chief will consider

Search and rescue


Exposures


Extension


Hazards


Fire lines


Assignment for rescue


Blockage


Irit


Passport


Hazmat


Staging 2md alarm

Special consideration meeds to be givien to warehouse that have?

Built in refrigeration freezer

Consideration needs to be considered because?

Of the different types of occupancies operating in this structure

Increased wster pressure is done by?

Miami dade water and sewer dept

When large volumes of water is needed, who do u notify?

Water supply officer

To prevent communication problems units will?

Need to be given portable radios in the staging area