• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/37

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

37 Cards in this Set

  • Front
  • Back
214. Time compliance technical order priorities


What TCTO priority would be issued if conditions could result in fatal or seriousinjury to personnel or extensive damageto or destruction of valuable property?


Immediate.

2. What TCTO priority requires to groundthe aircraft, prevent launch of missiles, discontinue operationof ground communication-electronic (C-E) systems or use of related support equipment, personnelequipment, engines, or munitions?

Immediate.

3. What TCTO priorityhas a compliance period of 1 to 10 days after receiptof kits, parts,and tools if required?

Urgent
4. What TCTO priorityhas a series of red diagonals alternately spaced with red Xs (/X/X/X)printed around the border of the first page?
Urgent

5. Commanders shall ensure distribution of Urgent action TCTOs are made to all affectedpersonnel within how many hours of receipt?


24 hours

215. Time compliance technical order types

1. List the seven types of TCTOs



Configuration change.

Inspection.


Commodity.


Companion.


Supplement.


Record.

Safety

2. Why are configuration TCTOs issued?



To modify a systemor commodity by adding, deleting, or alteringform, fit, function or interface of a component for a configuration item

3. What priorities may inspection type TCTOs be issued as?


Immediate Action, Urgent Action, or Routine Safety

4. What is an easy way to manage commodity TCTOswhere the actualserial numbersare not known?


Assign permanentserial numbers using procedures in TO00–20–2

5. Why are two TCTOs writtenwhen a companion TCTO is released?



One TCTO (the “companion”)shall be written against the enditem to removethe commodity item and replace itwith a modified item. Thesecond TCTO shall be written to modifythe commodity item itself


6. When will a routine safetyTCTO be issued?



When there is a safety deficiency that imposes a“remove from service” or flightrestriction

7. How are Immediate, Urgent, and Routineaction Safety Inspection TCTOswith less than 35 day compliance periodsnormally issued?


Interim
216. Levels of accomplishment

1. Who determines the TCTO level of accomplishment, whetherit’s organizational, intermediate, or depot level?


The PM,in coordination with the using command

2. What level of accomplishment will be designated when the requirements of the TCTO are less urgent, requiresextensive out-of-commission time for systems and equipment, or involveslarge man-hour expenditures, extensive shop facilities, and special skills?




Depot level

217. Time compliance technical order numberingHow are technicalorder numbers, including TCTO numberscategorized?


Based on functional usage or family groupings

2. How are TCTO series numbered?


The series will benumbered at thelowest level that willensure all military system and commodity users get needed support, and yeteliminate distribution to TODOs notconcerned with theTCTO

3. When TCTO supplements are issued, why are lettersI and O not authorized for use?


The letters Iand O are not used in order to avoidpossible confusion with numerals

4. What are the first four positionsof a numbered TCTO kit used to identify?


The first four positions of the TCTO kit identification number willbe the national stock classapplicable to the enditem being modified (e.g., 1560 for aircraft and structural components, 1420 for guided missiles, etc.)
218. Time compliance technical order programmanagement

Who administers and managesthe overall TCTO programas outlined in AFI 21–101and major command publications?


MaintenanceOperations PS&D
2. Who determines all scheduling, tracking, and day-to-day monitoring of TCTOs?


The owning scheduling agency (PS&D, EM,AMU PS&D,AGE, Armament, Munitions, andPMEL)
3.

Who will date stamp the TCTO to reflect the date the hard copy is received?


QA
4.

Who is the individual or individuals responsible to researchthe total number of end items applicable to the TCTO?


The appropriate TCTO managing agency (PS&D,EM, or Munitions)
5.

Who has the primary concern of the statusof TCTO completions?


Maintenance managers
6.

Who will ensureTCTO kits and/or parts are assembledprior to release?


The supplyTCTO monitor
7.

After the monthly supply TCTO reconciliation meeting, who will chair a monthly TCTO review meeting attendedby all TCTO owning and managing agencies?


PS&D
219. Maintaining time compliance technicalorders using IMDS1.

What screen is used to load basic data about a TCTO?


419
2.

What screen is used to load primary and assisting workcenters?


420
3.

What screen is used to schedule TCTOs?


89
4.

What makes up the nine digit YEAR EVENT ID?


The firsttwo digits signify the year, thenext three digits indicatethe Julian date, and the next four digits are sequence numbers issued by thecomputer regardless of unit ID
5.

What two screensare used by specialists to load completion data for a TCTO?


Screen 907 and 69
6.

After validation is completedusing screen 128, what on-lineinquiries can be used to verify completion data?


Screen 734 and 525
7.

What screen is used to make a demand on supplyfor TCTO kits and make corrections to specific information pertaining to a kit document number?


Screen 345

8.


What screen will provide you with kit statusdata?


Screen 486

220. Inquiries and background reports

1.


What screen inquiry provides a printout of all shop data for a TCTO?







Screen 663
2.

TCTOs that are currently open,in progress or held in suspense (but workable) status,are printed on what report?


Screen 530
3.

Which TCTO background report provides a listing by data code, TCTO number, recessiondate, or all equipment by type recordcode?


Screen 536