What are the organisation levels for materials planning? |
Client
Company Code Plant Storage Location |
|
The MRP and work scheduling views must be maintained by ____
|
Production
|
|
The 'basic data' in the material master is stored on what organisational level?
|
Client
|
|
The MRP, work scheduling, and accounting views are related to what organisational level?
|
Plant
|
|
Consumption-based planning provides materials based on ____
|
historical consumption
|
|
More significant and high valued materials (A goods) are classified as ____
|
MPS
|
|
What determines the quantity of materials produced without break or shifting?
|
Lot-sizing procedure
|
|
What are the two types of procurement?
|
In-house production
External procurement |
|
____ refers to the duration of in-house production for a particular material
|
In-house production time
|
|
____ refers to the duration of external procurement for a particular material
|
planned delivery time
|
|
Planned delivery times are independent of order quantity - true or false?
|
True
|
|
The behaviour of planned independent requirements is controlled by _____
|
the strategy group
|
|
The control of ATP checks is carried out using ____
|
the availability check group
|
|
A production procedure is defined by a ____
|
production version
|
|
The business processes and functions that can be assigned to a material is defined through ____
|
the material type
|
|
List and describe the 4 standard material types in SAP ERP
|
FERT: finished products
ROH: raw materials HALB: semi-finished products HAWA: trading goods |
|
What is a bill of material?
|
The composition of all materials used for the production of a particular product
|
|
BOM in SAP ERP are multi-level - true or false?
|
False. It is single-level
|
|
The BOM consists if ____ and ____
|
BOM header
BOM items |
|
Whereabouts in the BOM structure do all the settings valid for the entire BOM
|
BOM header
|
|
List and describe the 4 types of BOM items (item categories) in a BOM structure
|
1. stock items: are managed in warehouse and used for production
2. non-stock items: are assigned directly to a manufacturing order 3. variable-size items: contains variable size data 4. document items: contains a supplemental document that describes manufacturing use SNVD to remember |
|
Each item of a BOM does not need to be assigned to a item category - true or false?
|
False
|
|
Which of these item categories requires a material master and which does not -
Stock items Non-stock items |
Stock items - requires material master
Non-stock items - do not |
|
The definition of routings takes place where?
|
Routing groups and Group counters
|
|
A routing can contain 3 types of sequence, they are?
|
Standard sequence
Parallel sequence Alternative sequence |
|
Which type of sequence should be carried out when work steps should be performed simultaneously?
|
Parallel sequence
|
|
The time elements for routings are called?
|
Standard values
|
|
What is the link between profit planning and manufacturing (demand management)?
|
Sales and operations planning (SoP)
|
|
Demand management manages independent requirements - true or false?
|
True
|
|
What type of requirements is created by sales planning or concrete sales orders?
|
Independent requirements
|
|
What type of requirement is an item requirement, and determined by bill explosion?
|
Dependent requirements
|
|
Demand management aims at determining which ____ of a finished product and at which ____
|
Quantities
Time |
|
What type of order describes the concrete order of a customer?
|
Sales orders
|
|
Manufacturing is executed in ____
|
Production
|
|
SoP provides a method for ____, ____, and ____
|
sales planning
production planning feasibility estimated |
|
The two planning levels in standard SOP are?
|
Product group level
Material level |
|
The proportion factor in a product group is used for ____ of a sales plan from a higher level to a lower level
|
Disaggregation
|
|
The ____ allows for the development of sales and production plans
|
Planning table
|
|
How are sales or production plans, created at one level, reach the lower levels?
|
Disaggregation
|
|
The behaviour of independent requirements in mRP is determined by their ____ and ____
|
Requirement type
Planning strategy |
|
For make-to-order production, what type of requirements is used?
|
planned independent requirements
|
|
For make-to-stock production, what type of requirements is used?
|
Sales orders ( Customer independent requirements)
|
|
Which of the following materials can be produced to stock (make-to-stock):
Finished products Raw materials Semi-finished products |
Semi-finished products or assemblies
Raw materials are procured, not produced |
|
Sales orders affect requirements by consuming ____
|
planned independent requirements
|
|
The way sales orders consume planned independent requirements is dependent on the ____ and the ____
|
settings defined for consumptions
consumption periods |
|
List and describe the two consumption mode types
|
Backward consumption: consumes customer requirements with planned independent requirements lying BEFORE the customer requirements
Forward consumption: consumes customer requirements with planned independent requirements lying AFTER the customer requirements |
|
Where can consumption modes and periods for a material be set in the system?
|
in either the material master or the
MRP group |
|
What are Master schedule items?
|
items that influence the company's profits on a large scale and are important to the production procedure
|
|
What are the two MRP types?
|
MRP
Consumption-based |
|
What procedure does consumption based planning use as a simple planning technique?
|
Manual recorder point planning
|
|
Consumption-based planning is based on ____
|
historical consumption
|
|
MRP is based on ____
|
current and future sales
|
|
What is the first effect of a shortfall in stock in using MRP?
|
a purchase requisition (for trading goods) or a planned order (for semi-finished products) is generated.
|
|
When planning is complete in MRP for in-house production, the system generates a ____ which was converted from a ____
|
production order or process order
planned order |
|
For external procurement in MRP, the system creates a ____ or a ____, which is converted to a ____, and then to a ____ when planning is complete
|
planned order or purchase requisition
purchase requisition (if planned order is created) purchase order |
|
What are the two planning types featured in MRP?
|
total planning
individual planning |
|
What happens during net requirement calculation?
|
A comparison between stock and fixed receipts AND the safety stock and requirements is carried out
The result of the comparison is the 'quantity available for planning' |
|
During net requirements calculation, what happens if the system notices a material shortfall?
|
Procurement proposals are created accordingly - purchase requisitions or planned orders
|
|
What are the two levels where an MRP run can be conducted?
|
overall planning for a plant and,
for a particular material |
|
What are the 5 parameters that need to be entered when calling up an MRP run?
|
processing key
characteristics whether the run should create MRP lists planning mode MRP group |
|
What are the 3 types of processing keys?
|
NEUPL: regenerative planning
NETCH:net change for total horizon NETPL:net change for planning horizon |
|
Stock/requirements list contains the status of ____, ____, and ____
|
stock
requirements receipts |
|
What is the difference between stock/requirements list and MRP list?
|
stock/requirments list is dynamic while MRP list is static
|
|
For in-house production, planned orders are converted into ____
|
production order or process order
|
|
for external procurement, planning run creates what type of documents?
|
purchase requisitions or purchase orders
|
|
A product group supports the planning process by grouping products according to ____
|
planning characteristics
|
|
Which options are available for processing material planning?
|
Single-item planning (single-level, multi-level, or interactive)
Total planning online Total planning in the background |
|
A _________________ is the organizational entity for which balance sheets as well as profit and loss statements can be executed across company codes covering a company’s main areas of operation.
|
Business area
|
|
The ___________________________________ determines the structure of a balance sheet and income statement as far as which accounts map to which line items on the report.
|
Financial statement version
|
|
The __________________ GL account is responsible for Purchasing.
|
GR/IR
|