a. Conceptual Framework &
related requirements of the Project. b. gathers relevant info & data incl. scope of Architect's Services. c. refines Owner's space req's & translates into an Arcitectural Program. d. prepares Initial Statement of Probable Construction Cost. |
1. Project Definition Phase (5%)
|
|
consists of the preparation
of Schematic Design Studies leading to Conceptual Plans. a. evaluates Owner's program, schedule, budget project site & process methods of project deliveries. b. Initial Line drawings, general description of the Project for Owner's Appro- val c. Submits to the Owner a Statement of Probable Construction Cost (SPPCC) |
2. Schematic Design Phase (15%)
|
|
based on APPROVED
Schematics & Conceptual Plans. a. Design Docs : Plans, Elevations, Sections, & other Drawings b. Outline Specifications: type of materials type of Structural Electrical, Mechanical, Sanitary, Electronic, & Communication Systems c. Diagrammatic Layout of Construction Systems d. Updated SPPCC to Owner |
3. Design Development Phase (15%)
|
|
based on the APPROVED
Design Development Docs. a. Contract Documents: (detailed designs & Construction Drawings) Architectural, Structural, Plumbing/Sanitary, Mecha- nical, Electronic & Comm. works. b. Technical Specifications c. Submits to the Owner (7) sets of all Construction Drawings & Technical Specifications for obtaining Building Permit |
4. Contract Document Phase (55%)
total of (90%) |
|
prepares Bid Documents:
form for Contract Letting, Construction Docs, forms for Invitation & Instruction to Bidders,forms for Bidder's Proposals, General/specific conditions of Contract. assists Owner in estab- lishing a List of Prospective Contractors to the awarding of the Construction Contract. |
5. Bidding or Negotiation Phase
|
|
a. makes decision on all
Claims of the Owner & Contractors b. prepares Change Orders, turns over to the Owner written guarantees reqd. by the Contractors & Sub-Cons. c. makes periodic visits to Site. d. determines the amount owing & due to Contractor. The Architect shall conduct inspection to determine the date of substantial & final completion & Issue the Final Certificate of Payment to the Contractor. |
Construction Phase
|