• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/35

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

35 Cards in this Set

  • Front
  • Back
What are the responsibilities of the transpertation supervisor?
The responsibilities of the transportation
supervisor are to supervise and control operations,
operator maintenance, and the cycle of automotive,
construction, and weight-handling equipment.
Major construction equipment, automotive
equipment, specialized equipment, amphibious gear,
and civil engineer support equipment (CESE) are
classed as what?
2c materials
Who has management responsibility for 2C
materials?
The Civil Engineer Support Office (CESO) at the
Naval Construction Battalion Center, Port Hueneme,
What does the NAVFAC P-404 do?
Establishes criteria, policies,
and procedures for the management of CESE
assigned to the Naval Construction Force (NCF),
Special Operating Units (SOUs), and the Naval
Construction Training Centers (NCTCs).
What are the 4 parts the 11200.1 is divided into?
Administration, operation, and maintenance of
automotive and construction equipment.
Naval Construction Force Manual,
WVFAC P-315 is divided into how many parts?
2
Explain the first part of the Naval Construction Force Manual,
WVFAC P-315
The first part presents an overview of
the NCF, including reserve NCF, and the organizational
structure and functional roles of key members of an
NMCB.
Explain the second part of the Naval Construction Force Manual,
WVFAC P-315
The second part describes the mission,
organizational structure, and concepts of operation for
NCF units other than the NMCB, and describes the
commands involved with NCF support.
What is the CONSTRUCTION AUTOMOTIVE
SPECIAL EQUIPMENT/MANAGEMENT
INFORMATION SYSTEM(CASE/MIS)?
A computer program used for
management and procurement of all CESE. The Civil
Engineer Support Office (CESO), Port Hueneme,
maintains this program.
What is a TAB A?
An equipment list is initiated by CESO and is
updated by the Second and Third NCB equipo office
from the CASE/MIS computer program.
What is a Equipment Code (EC)?
The primary
purpose of equipment codes is to establish permanent
and positive identification of each unit of CESE.
What is the NAVFAC 9-11240/2?
Dispatcher’s Log
What is the NAVFAC 9-11240/13?
The Operator’s Inspection Guide and
Trouble Report (HARD CARD)
What is the NAVFAC
11260/4?
The Operator’s Daily PM Report.
Motor Equipment Utilization Record, DD Form 1970 is known as what?
(Trip Ticket)
How long are logs retained on file by the dispatchers in the NCF?
In the NCF, the logs are retained on file by
the dispatchers for a period of 90 days.
How long is the DD Form 1970 retained on file by the dispatchers in a public works?
90 days
How long is the Dispatchers log retained on file in a public works?
36 months
What is The standard
interval between PM service inspections for NCF
equipment
40 working days
CESE assignments are divided into how many dispatch
categories?
3 Class A, Class B, and Class C.
How long is a Class A dispatch category?
The Class A dispatch category is the full-time
assignment of a vehicle to an individual.
How long is a Class B dispatch category?
The Class B dispatch category in the NCF
normally is the once a week assignment of a vehicle
that requires a DD 1970 (Trip Ticket).
What dispatch class category are made on an “as needed” basis?
Class C
What is the yard boss?
Yard boss is responsible for the access, traffic
flow, and condition of the equipment yard, the
refueling facility, and supports the equipment
washrack, the cycling and upkeep of equipment, and
daily transportation operations.
What kit provides the minimum tools and
equipment resources necessary to support operator
maintenance?
Kit 80111
How often must equipment cycling take place?
On a weekly bascis
The COMSECOND/COMTHIRDNCB equipo goal
for PM-to-interim repair ratio is what?
Three scheduled PM
inspections to each interim repair.
What is Equipment availuability?
The percentage of time
the equipment is available for dispatch compared to
downtime.
Items such as hoses for pumps and bits for the earth
auger are known as what type of collateral equipage?
Component
Items
common to the equipment, such as top canvas and
tarpaulin, bows and side racks, spare tire and rim,
jack and lug wrench, and chains with hooks and
binders are known as what type of collateral equipage?
Tactical
What are the three CESE Maintenance System of the NCF and SOU categories of maintenance.
(1) organizational, (2) intermediate,
and (3) depot.
What two classifications is Organizational Maintenance divided into?
Operator maintenance and preventive
maintenance.
What type of maintenance is performed on equipment
requiring major overhaul or comprehensive
restoration that returns CESE to a like-new condition.
Depot Maintenance
What type of maintenance is the removal,
replacement, repair, alteration, calibration, modification,
and the rebuild and overhaul of individual
assemblies, subassemblies, and components.
Intermediate Maintenance
When should CESE be placed in live storage?
When there is no
planned need for it for a period covering two PM
cycles or 80 working days.