• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/4

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

4 Cards in this Set

  • Front
  • Back
Four Phases of Structural Collapse Rescue
• Phase I: Size-Up, Scene Mgt & “Surface” Victim Rescue
• Phase II: Search All Accessible Areas & Void Spaces
• Phase III: Selected Debris Removal
• Phase IV: General Debris Removal
Initial Actions at Scene of Structural Collapse
• Phase I: size up etc.
- Id add'l resources: local & special (heavy equipment)
- Control Perimeter
- Secure all utilities
- Deploy hose lines if necessary
- Support services: Red Cross, Salvation Army, Utilities
• Phase II: Search Accessible Void Spaces
• Phase III: Selected Debris Removal
US&R Operational Capability
• Basic Operational Level: Surface search & rescue
• Light Operational Level: light frame construction
• Medium Operational Level: reinforced & masonry, concrete tilt-up & heavy timber
• Heavy Operational Level: reinforced concrete, steel frame & confined space
Search Diagram