• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/43

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

43 Cards in this Set

  • Front
  • Back
What Are Vital Systems
1. Fuel System
2. Fire Main
3. CO2 and Halon Systems
4. Bilge Systems
5. Steering System
6. Propulsion System and Aux controls
7.Ships Service and emergency generation system
8. any engineering system identified by the OCMI.
182.710
What vsls are required to have a fire pump
A vsl more than 65 feet, a vsl that carries more than 49 passengers, or a ferry vsl
181.300
A vsl that carries more than 49 passengers or is greater than 65 ft must have a pump of at least _____ and a pressure of _____?
50 GL per min, pressure not less than 60 psi at the pump outlet.
Diesel fuel piping of aluminum is acceptable on aluminum hull vessels if it is a minimum of?
Schedule 80 wall thickness. 182.455 (a) (1) (i)
In addition to adult life jackets a number of child size life jackets equal to at least ____ of the number of persons permitted must be provided
10%, 180.71
On a vsl less than 65 carring more than 50 pax the minimum capacity o fa fire pump must be?
50 gallons per minute, not less than 60 psi at pump outlet and fitted with a gugage. 181.300 (b)
In addition to adult life jackets a number of child size life jackets equal to at least ____ of the number of persons permitted must be provided
10%, 180.71
Lead holes for wood screws should be about ___% of the root diameter of the screw for hardwood and about ___% of the rood diameter for softwoods.
90% 70%
NVIC 7-95
What is considered wet wood?
Above 18% moisture content. NVIC 7-95
What vsl's are required to have load lines?
79 feet or more, constructed after 7/2/68, on other than domestic voyage. 175.122
Who is the prime assigning and issuing authority for loadlines.
ABS
Who is required to have draft marks?
Any vsl with one of the following greater than 65, more than 12 on an international voyage or more than 1 deck above the bulkhead deck exclusive of a pilot house.
What are the VA no discharge zones?
Smith MT. Lake, Lynnhaven River, Broad Creek.
What are the harbors of safe refuge for VA?
Rudee Inlet, Cape Charles/Cape Henry, Chincoteague, Ocean City
CID 15
What is the required nominal pipe size for bilge pipe?
1 in for vsls less than 65 ft, 1.5 for greater.
182.510
A CO2 cylinder may be inclined not more than ___ from vertical unless fitted with a flexsible or bent siphon tubes, in which case they may be inclined not more than ____ from vertical.
30 deg, 80 deg
181.410 (c)(ii)(7)
What are flare and smoke signal requirment for various routes?
3 and 3 for lakes bays and sounds, and rivers. 6 and 6 for oceans, coastwise and limited coastwise.
What is the definition of Coastwise?
A route not more than 20 NM offshore. (Exposed)
What is the definition of an exposed route?
A route greater than 20 nm from a harbor of safe refuge. (Oceans, Coastwise and Great Lakes)
What is the definition of high seas?
Greater than 3 nm offshore
What is the definition of an Oceans route.
Greater than 20 nm offshore (Exposed)
For most portions of a steel vessel, without other weakening factors, a local thickness deterioration of up to about ___% may be accepted.
25%
NVIC 7-68
Steal vsl's built to less than commercial scantlings should generally be replaced when wasted more than ____%
15%
NVIC 7-68
What is the Steel NVIC?
7-68
What is Subchapter T part 176?
Inspection and Certification
What is Subchapter T part 177?
Construction and Arrangement
What is Subchapter T part 178?
Intact Stability and Seaworthiness
What is Subchapter T part 179?
Subdivision, Damage Stabiliity and Watertight Integrity.
What is Subchapter T part 180?
Lifesaving Equipment and Arrangements
What is Subchapter T part 181?
Fire Protection Equipment
What is Subchapter T part 182?
Machinery Installation
What is Subchapter T part 183?
Electrical Installation
What is Subchapter T part 184?
Vessel Control and Miscellaneous Systems and Equipment
What is Subchapter T part 185?
Operations
When doing an air test as field testing for a weld, spaces should be pressed up with ____ psi.
1.5-2 PSI
What is the maximum allowable for insets?
1 in per linear foot up to 4 in.
Inland Barge Guidance
When using a drill stop repair, drill holes should be ______?
Approx 2 plate thicknes beyond ends of crack. diameter shold be equal to plate thickness.
For full pen welds on steel vsl, if greater than ___ the plate must be beveled at ____.
1/4" / 60 deg AWS 4.3
For salt water service what are the standards for sampling fasteners.
10th year of age and every 5th after.
NVIC 7-95
Durring the scope of random samplings of fasterings remove a minimum of ___ fastenings pers side.
8
NVIC 7-95
For wood boats as a rule of thumb, a replacement plank should extend how many frame spaces?
At least 6
NVIC 7-95
When is a collision bulkhead required?
More than 65 feet, carries more than 49 pax, operates in exposed waters, is more than 40 ft and operates on partially protected waters, or constructed of wood after March 11 2001 and operates in cold water.
46 CFR 179.115
Any penetration in the hull less than _____ above the deepest load waterline must have _______________?
6'' means to prevent water from entering the vsl.
179.350