• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/11

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

11 Cards in this Set

  • Front
  • Back

SWOT analysis

Used to focus on specific tasks that avoid negative outcomes

Parts of SWAT

Strengths


Weakness


Opportunities


Threats

System request

Starting point of most projects. A request is submitted to study a potential project

Operational feasibility

The proposed system will be used effectively after it has been developed

Technical feasibility

Refers to the technical resources needed to develop purchase install or operate the system

Economic feasibility

Means that the projected benefits of the proposed system outweigh the estimated cost

Schedule feasibility

Means that a project can be implemented in an acceptable time frame

Discretionary projects

Projects where management has a choice in implementing a project

Nondiscretionary projects

Projects where no choice exists

Project scope

Defining the specific boundaries or extent of the project

Constraint

Requirement or condition that the system must satisfy