• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/10

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

10 Cards in this Set

  • Front
  • Back

Feeder Overcurrent Operation

1. Notify DOC


2. Visually inspect CB 1202


3. Write flags down


4. Turn 43L/R to local


5. Close CB 1202


6. Return 43L/R to remote

Slow Breaker Operation. What happened

1. CB 1202 is slow to open


2. 86B Lockout operates


3. Xfmr HS FID 1 Opens


4. CB 1201 Opens


5. CB 1202 Finally Opens


6. 86B Lockout Resets


7. Xfmr HS Closes Back


8. CB 1201 Closes back

Slow Breaker Operation. Visual Indicators

1. CB 1202 is op


2. 86B Lockout knocked down


3. Overcurrent flag on Primary Relay DPU/351S of CB 1202


4. Overcurrent flag on 501-2 backup Relay of CB 1202


5. Breaker fail flag on DPU/351S Relay of CB 1202


6. 74BF-HAA Relay flagged (bus tie panel)


7. Make sure to write down all flags before doing any switching.

AS

Air SwitchBasic Sectionalizing SwitchDrop: 9/5 miles.


69kv, 9 miles, 5 MW and less then 2 MVARS


138kv, 5 miles, 25 MW and minimize MVARS

LD

Line DropBuggy Whip interrupterDrop: 30/15 miles


69kv, 30 miles, Loop splitting 5MW


138kv, 15 miles Loop splitting 25 MW

LS

Loop Splitvacuum interrupter bottleDrop: 9/5 miles


9 miles 69 Kv Loop splitting 100+MW


5 miles 138 Kv Loop splitting 200+ MW


LDS

Line Drop/Loop SplitBuggy whip/vacuum interrupter bottle.Drop:


30 miles 69kV Loop splitting 100+MW


15 miles 138kV Loop splitting 200+MW

LDB

Load Break Has 6 vacuum bottles (2 per phase) or a circuit switcher SF6 (FID)Drop:


300/300 miles


69kV/138kV Loop splitting any amount

69Kv

Line Dropping. Loop splitting.


AS = 9 Miles. 5MV and>2MVARS


LD = 30 Miles. 5MW.


LS = 9 Miles. 100+MW.


LDS= 30 Miles. 100+MW.


LDB= 300 Miles. Any amount.

138kv

Line Dropping Loop Splitting


AS = 5 Miles. 25MW & min MVARS.


LD = 15 Miles. 25MW


LS = 5 Miles. 200+MW


LDS =15 Miles. 200+MW


LDB=300Miles. Any amount.