• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/5

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

5 Cards in this Set

  • Front
  • Back
What is the purpose of the two Switchyard station power transformers? Steps: A. Down 13.8-kV to 208 V for Switchyard use. B. Up 4.16-kV to 13.8 kV for bus SL-7 and SL-8. C. Up 13.8-kV to 69-kV for Burlington/Athens power supply. D. Down 69-kV to 13.8-kV for manual throw over 13-23.
Answer 1. A
The WCGS Switchyard uses line traps to: A. Isolate SF-6 breakers from the rest of the Switchyard for maintenance or fault protection. B. Connect the plant to the Switchyard and the Switchyard to other switchyards. C. Prevent certain radio frequencies from being transmitted into the Switchyard. D. Delineate right-of-way between WCGS operated equipment and System Operations operated equipment.
Answer 2. C
What is the electrical power supply for the motor control center located in the Blowdown Discharge Structure, during normal lineup? A. Athens substation. B. Makeup Discharge Structure. C. Burlington back feed. D. Greene Substation.
Answer 1. D
What is the normal power supply to the Construction Power Loop?
Answer: SL-8 in the No. 1 switchgear house normally supplies Site Construction Power Loop via breakers 13-2 (13-4 alt)
What is the purpose of the Site D.C. Power Distribution System?
Provide DC power for control and metering devices for Site components.