• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/5

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

5 Cards in this Set

  • Front
  • Back
A seismic event measuring 2.0 on the Richter scale caused the seismic recorder to activate. If the event had been 3.0, what would have been the difference in MAGNITUDE. A. 10 times.B. 2 times.C. 100 times.D. 1000 times.
A
What is the function of the Strong Motion System? A. Interfaces with the Response Spectrum Recorders providing the analog indication of recorded data.B. Gives local visual indication of seismic activity at the Containment base slab (2000' Auxiliary building).C. Provides engineering with a permanent recording on magnetic tape of local peak acceleration.D. Digitally records the acceleration of the earth at selected locations due to earthquakes.
D
What is the function of the Peak Recording Accelerographs (PRA)?Records earthquake activity: A. for replay on the Seismic Data Acquisition SystemB. on the GNC CR-12 recorderC. locally at the accelerographs for engineering analysisD. for analysis using the Response Spectrum System
C
When does the Response Spectrum Annunciator provide a local visual warning? A. When an earthquake exceeding the Operating Basis Earthquake or a Safe Shutdown Earthquake has occurred.B. After any north / south or east / west seismic motion and then automatically resets after 30 seconds.C. After any seismic activity is received from the sensors of the Strong Motion Systems.D. When triggered by the Free Field Accelerometer located 300 feet due west of the reactor vessel.
A
The plant is at 3% power preparing to go to Mode 1 when it is determined that one of the required Seismic Monitoring instruments is inoperable.In this situation the plant: A. must shutdown the plant until the inoperable instrumentation is repaired.B. may continue to increase power to 100% but must restore the inoperable channel within 30 days.C. may remain at power indefinitely as long as power remains <5%.D. must restore the inoperable instrumentation prior to entering Mode 1.
B