Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
4 Cards in this Set
- Front
- Back
6. What is the maximum time frame an Approved Requirement and Unapproved Requirement should remain on the Requirements Review?
|
Approved – 3 days
Unapproved - 15 days (P-485 para 3725.3b) |
|
5. What is the purpose of the Requirement Listing?
|
The purpose of the requirements review listing is to enable the ship to identify real time status of requests moving within their logistics system.
|
|
3. How often should the item verification listing be processed?
|
daily
|
|
item verification aka
|
tech edit
|