• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/23

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

23 Cards in this Set

  • Front
  • Back
What is Six Sigma
An organisational philosophy on achieving customer satisfaction
A methodology focused on reduction of variation
A statistical term for variation:6σ
* Full Time 6 Sigma Leaders
•Manage BB Projects & Plant 6 Sigma
•Run 6 Sigma Projects
•Instruct & Train BB, GBs, & YB
Belong to which six sigma role ?
Master Black belt
Six Sigma stands for how many defects in a million
3.4 defects
What kinds of varation are there?
Special and common variation
CTQ and CTC stands for ?
Critical to Quality and Critical to customer
Define the 3 CTC and the related CTQs for airport shuttle company
.....
What are the main benefits of Six Sigma?
1. Improved process flows
2. Higher level of customer satisfaction
3. Improved quality liability
4. Decreased time to market
Explain in your own words the DMAIC approach?
Define, Measure, Analysis,Improve,Control
Explain the difference between CTC and CTP?
Critical to Customer and Critical to Process
What is the relationship between VoC and VoP?
In order to define VOP . You need to know VOC
Explain feedback loops ?
A major purpose is providing the information needed to take action with respect to a process. By having a feedback loop you can obtain information from your outputs and relate them into special or common causes.
Senior exective (CEO or president), green belt,yellow belt,executive committee member, champion , master black belt ,black belt ,

Put them in the right order of hierachy .
Senior exective (CEO or president), executive committee member, champion , master black belt ,black belt , green belt, yellow belt
PDSA stands for ?
plan, do, study, act (PDSA)
Name the 5 five inputs for a process
1.Manpower/services
2.Equipment
3.Materials/Goods
4.Methods
5.Enviroment
Which statement about operational definitions is NOT correct?

A. An operational definition should ensure that all data collectors have the same understanding
B. An operational definition should be defined after the measurement system analysis (MSA) is performed
C. An operational definition is part of a data collection plan
A
Which of the following Six Sigma roles is trained on the improvement methodology of Six Sigma and will part time lead a process improvement or quality improvement team. He or she plays an important role, at both an organization and process level, in executing the Six Sigma process.

A.Yellow Belt
B.Green Belt
C.Black Belt
B
Which of the following Six Sigma roles are leaders of teams and are full time responsible for measuring, analyzing, improving and controlling key processes that influence customer satisfaction and/or productivity growth?

A.Yellow Belt
B.Green Belt
C.Black Belt
C
Process Owner does the following things:
Manager of the process
Authority to change the process
Ensuring process objectives are met
Understanding of the process knowlegde of the process
o
DPU stands for:
= Defects per Unit, average defects/(N)
DPO stands for:
=Defects per Oppertunity,number defects/defect opportunities
DPMO stands for ?
=Defects per Million Oppertunities, is DPO *1000000
* Part-Time 6 Sigma Leaders
* Run Mini 6 Sigma Projects
To which role do they belong?
Green Belt
Explain Basic process
Inputs-Process-Outputs