• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/4

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

4 Cards in this Set

  • Front
  • Back

Front (Term)

Approach Permanent Speed Restriction Sign


Proceed prepared to operate at prescribed speed through permanent speed restriction. This sign will be mounted on an overhead bridge or on a pole approximately 12 feet above the top of the rail. If the same speed restriction applies to all tracks, one approach permanent speed restriction sign may be used. If the speed restriction differs for any track, additional signs may be used

Front (Term)

Permanent Speed Restriction Sign


Proceed not exceeding speed shown on approach permanent speed restriction sign until the entire train has passed the restriction. This sign will be mounted over an overhead bridge or on a pole approximately 12 feet above the top of the rail.

Front (Term)

Proceed Cab


Proceed governed by cab signal indication

Front (Term)

Normal Cab


Proceed at MAS