Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
19 Cards in this Set
- Front
- Back
when was the NEC opened? |
1976 |
|
where was the NEC opened? |
greenbelt land next to the airport |
|
When was the ICC and Symphony hall opened? |
1991 |
|
how many events does the ICC hold per year? |
350 |
|
when was Brindley place built? |
1993 |
|
how much did brindley place cost? |
350 milion pounds |
|
what is at brindley place? |
sea life centre RBS |
|
when did millennium point open? |
2002 |
|
how much was millenium point? |
115 million |
|
what was the custard factory redevelopment? |
100 studio offices arts and media development |
|
when did the bullring open? |
2003 |
|
how much did the bullring cost? |
530 million |
|
how many jobs did the bullring create? |
8000 |
|
how many visitors per year does it get? |
35 million |
|
when did Matthew Boulton collage open? |
2005 |
|
how many courses does the matthew boulton collage teach? |
over 500 |
|
how many students does the collage have? |
7000 |
|
when did new street station open? |
2015 |
|
what will new street station cause? |
create up to 1000 new jobs stimulate regeneration in the area |