• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/18

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

18 Cards in this Set

  • Front
  • Back
air lots

Right to use open space above a property, usually allowing the surface to be used for another purpose. 19

base lines

Main imaginary line running east and west and crossing a principal meridian at a definite point. (rectangular survey system) 88

benchmark

Permanent reference marks or points established for use by surveyors in measuring differences in elevation 94

datum

A horizontal plane from which heights and depths are measured. 94

legal description

A description of a specific parcel of real estate complete enough for an independent surveyor to locate and identify it.

lot-and-block (recorded plat) method

A method of describing real property that identifies a parcel of land by reference to lot and block numbers within a subdivision, as specified on a recorded subdivision plat. 91

metes-and-bounds method

A method used to describe a parcel of land that begins at a well-marked point and follows the property's boundaries, using directions and distances around the tract, back to the place of beginning (POB). 86

monuments

A fixed natural or artificial object used to establish real estate boundaries for a metes-and-bounds description. 87

plat map

A map of a town, section, or subdivision indicating the location and boundaries of individual properties. 91

point of beginning (POB)

In a metes-and-bounds legal description, the starting point of the survey, situated in one corner of the parcel; all metes-and-bounds descriptions must follow the boundaries of the parcel back to the point of beginning. 86

principal meridians

The main imaginary line running north and south and crossing a base line at a definite point. (rectangular survey system) 88

ranges

A strip of land 6 miles wide, extending north and south and numbered east and west according to its distance from the principal meridian in the rectangular survey system. 88

rectangular (government) survey system

A system established in 1785 by the federal government, providing for surveying and describing land by reference to principal meridians and base lines. 88

sections

A portion of a township under the rectangular survey system. 36, numbered 1 through 36. Square with mile-long sides and an area of one square mile, or 640 acres.

survey

The process by which boundaries are measured and land areas are determined; the one-site measurement of lot lines, dimensions, and position of a house on a lot, including the determination of any existing encroachments or easements 93

tiers

Strips of land that are 6 miles wide, extending ease and west and numbered north and south according to their distance from the base line in the rectangular survey system. 88

township lines

All the lines in a rectangular survey system that run ease and west, parallel to the base line and 6 miles apart. 88

township

The principal unit of the rectangular survey system. 6-mile square of 36 square miles. 89