Study your flashcards anywhere!

Download the official Cram app for free >

  • Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

How to study your flashcards.

Right/Left arrow keys: Navigate between flashcards.right arrow keyleft arrow key

Up/Down arrow keys: Flip the card between the front and back.down keyup key

H key: Show hint (3rd side).h key

A key: Read text to speech.a key

image

Play button

image

Play button

image

Progress

1/5

Click to flip

5 Cards in this Set

  • Front
  • Back
The process of evaluating overall project performance on a regular basis to provide confidence that the project will satisfy the relevant quality standards is called:

A - Quality Assurance
B - Quality Control
C - Quality Planning
D - Quality Review
A
The process of monitoring specific project results to determine if they comply with relevant quality standards is called:

A - Quality Assurance
B - Quality Control
C - Quality Planning
D - Quality Review
B
A histogram ordered by frequency of occurrence that shows how many results were generated by each identified cause is:

A - Statistical Histogram
B - Juran Histogram
C - Fishbone Diagram
D - Pareto Diagram
D
Tools and techniques used during the Quality Planning process include:

A - Benefit / cost analysis
B - Benchmarking
C - Quality audits
D - A and B
E - all of the above
D
Quality management deals with all of the following topics except:

A - Conformance to requirements / specifications
B - Satisfying the needs of the customer
C - Making products more desirable and luxurious
D - A and C
E - B and C
C