Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
54 Cards in this Set
- Front
- Back
Grave Violations |
10,000 |
|
Excavation for foundation |
10% of the building permit fees |
|
Construction of foundation |
25% of building permit fees |
|
Construction of superstructure upto 2.00m above estab. grade |
50% of the building permit fees |
|
Construction of superstructure above 2meters |
100% of the building permit fees |
|
Failure to pay annual inspection fee within 30 days |
a surcharge of 25% of the inspection fee |
|
NSCP |
National Structural Code of the Philippines |
|
Any building, portion, device, which may cause fire or explosion |
FIRE HAZARDS |
|
Ancillary Permits |
Duly signed and sealed by the corresponding professionals...
1. Architectural permit 2. Civil/Structural permit 3. Electrical Permit 4. Mechanical permit 5. Sanitary permit 6. Plumbing permit 7. Electronics permit |
|
a permit for minor constructions like shed, outhouses, greenhouse, children's playhouses |
ACCESSORY PERMIT |
|
# of sets of survey plans, design plans |
5 sets |
|
ilang years liable for damages ang ar o ce? |
15 years |
|
"REVISED IMPLEMENTING RULES AND REGULATIONS OF THE NATIONAL BUILDING CODE OF THE PHILIPPINES" / "IRR" |
PD 1096 |
|
increases the height and/or floor area |
ADDITION |
|
Any of the various units of the government |
AGENCY OF THE GOVERNMENT |
|
Changes in the materials used, partitioning, location/size of openings |
ALTERATION |
|
Preformatted prescribed application form |
APPLICATION FORMS |
|
Any person, firm, partnership... Applying for the issuance of permits and certificates |
APPLICANT/PERMITTEE |
|
the executive officer of the OBO appointed by the secretary |
BUILDING OFFICIAL |
|
document issued by the BO (building official) to an owner/applicant to proceed with construction |
BUILDING PERMIT |
|
National Building Code of the Philippines |
CODE - PD 1096 |
|
All on site work done in the site preparation, excavation |
CONSTRUCTION |
|
change in the use or occupancy of building |
CONVERSION |
|
systematic dismantling or destruction |
DEMOLITION |
|
Department of Public works and highways |
DEPARTMENT |
|
the executive officer or head of the NBCDO |
EXECUTIVE DIRECTOR |
|
transfer of building/structures or portions from original location to another |
MOVING |
|
The office authorised to enforce the provisions of the Code and its IRR |
OFFICE OF THE BUILDING OFFICIAL (OBO) |
|
applicable provisions of the various agency and technical professional codes |
REFERRAL CODES |
|
any physical change made on building to increase the value, quality and improve aesthetic |
RENOVATION |
|
Remedial work done on any damaged or deteriorated portion |
REPAIR |
|
head or chief executive officer of DPWH |
SECRETARY |
|
personnel of the National Building Code Development Office (NBCDO) |
STAFF |
|
wood construction |
TYPE I |
|
wood construction with protective fire resistant materials, (1- hr fire resistive) |
TYPE II |
|
masonry and wood construction, 1hr fire resistive |
TYPE III |
|
steel, iron, concrete, or masonry construction, (1hr fire resistive) |
TYPE IV |
|
4 hr fire resistive, steel, iron, concrete, masonry construction |
TYPE V |
|
flame spread of 50 na test |
TUNNEL TEST |
|
areas within which only certain types of buildings are permitted to be constructed on their use of occupancy, type of construction and resistance to fire |
FIRE ZONES |
|
- permitted without fire-resistivity measures, country sides or rural areas - built of indigenous materials such as bamboo, sawali, nipa, cogon (TYPE I AND II) |
NON- FIRE RESTRICTED ZONES |
|
- permitted within prescribed fire- resistivity measures for exterior walls of at least 2hr fire resistivity - usual locations in suburban areas (TYPE II, III, AND IV) |
FIRE RESTRICTIVE ZONES |
|
- where in highly fire- resistive or non-combustible buildings assemblies of no less than 3-4 hr fire resistivity (TYPE IV AND V) |
HIGHLY FIRE RESTRICTIVE ZONES |
|
means the degree to which a material can withstand fire as determined by generally recognised and accepted testing methods |
FIRE- RESISTIVE RATING |
|
is the length of time a material can withstand being burned (1hr - 4hrs) |
FIRE-RESISTIVE TIME PERIOD RATING |
|
the secretary shall prescribe --- on the testing of construction materials for flame-spread characteristics etc... |
FIRE-RESISTIVE REGULATIONS |
|
OCT |
ORIGINAL CERTIFICATE OF TITLE / ORIGINAL CERTIFICATE OF THE TITLE (BOOK REF) |
|
TCT |
TRANSFER CERTIFICATE OF THE TITLE |
|
COA |
COMMISSION ON AUDIT |
|
"ECONOMIC AND SOCIALIZED HOUSING PROJECTS" |
Batas Pambansa Bilang 220 (BP 220) |
|
pumirma ng unang building code |
Ferdinand Marcos |
|
pumirma ng revised building code |
Gloria Macapagal Arroyo |
|
Pritzker winner ng 2024 |
RYKEN YAMAMOTO |
|
# of sets ng plans sa fire safety requirements |
1 set |