• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/54

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

54 Cards in this Set

  • Front
  • Back

Grave Violations

10,000

Excavation for foundation

10% of the building permit fees

Construction of foundation

25% of building permit fees

Construction of superstructure upto 2.00m above estab. grade

50% of the building permit fees

Construction of superstructure above 2meters

100% of the building permit fees

Failure to pay annual inspection fee within 30 days

a surcharge of 25% of the inspection fee

NSCP

National Structural Code of the Philippines

Any building, portion, device, which may cause fire or explosion

FIRE HAZARDS

Ancillary Permits

Duly signed and sealed by the corresponding professionals...



1. Architectural permit


2. Civil/Structural permit


3. Electrical Permit


4. Mechanical permit


5. Sanitary permit


6. Plumbing permit


7. Electronics permit

a permit for minor constructions like shed, outhouses, greenhouse, children's playhouses

ACCESSORY PERMIT

# of sets of survey plans, design plans

5 sets

ilang years liable for damages ang ar o ce?

15 years

"REVISED IMPLEMENTING RULES AND REGULATIONS OF THE NATIONAL BUILDING CODE OF THE PHILIPPINES" / "IRR"

PD 1096

increases the height and/or floor area

ADDITION

Any of the various units of the government

AGENCY OF THE GOVERNMENT

Changes in the materials used, partitioning, location/size of openings

ALTERATION

Preformatted prescribed application form

APPLICATION FORMS

Any person, firm, partnership... Applying for the issuance of permits and certificates

APPLICANT/PERMITTEE

the executive officer of the OBO appointed by the secretary

BUILDING OFFICIAL

document issued by the BO (building official) to an owner/applicant to proceed with construction

BUILDING PERMIT

National Building Code of the Philippines

CODE - PD 1096

All on site work done in the site preparation, excavation

CONSTRUCTION

change in the use or occupancy of building

CONVERSION

systematic dismantling or destruction

DEMOLITION

Department of Public works and highways

DEPARTMENT

the executive officer or head of the NBCDO

EXECUTIVE DIRECTOR

transfer of building/structures or portions from original location to another

MOVING

The office authorised to enforce the provisions of the Code and its IRR

OFFICE OF THE BUILDING OFFICIAL (OBO)

applicable provisions of the various agency and technical professional codes

REFERRAL CODES

any physical change made on building to increase the value, quality and improve aesthetic

RENOVATION

Remedial work done on any damaged or deteriorated portion

REPAIR

head or chief executive officer of DPWH

SECRETARY

personnel of the National Building Code Development Office (NBCDO)

STAFF

wood construction

TYPE I

wood construction with protective fire resistant materials, (1- hr fire resistive)

TYPE II

masonry and wood construction, 1hr fire resistive

TYPE III

steel, iron, concrete, or masonry construction, (1hr fire resistive)

TYPE IV

4 hr fire resistive, steel, iron, concrete, masonry construction

TYPE V

flame spread of 50 na test

TUNNEL TEST

areas within which only certain types of buildings are permitted to be constructed on their use of occupancy, type of construction and resistance to fire

FIRE ZONES

- permitted without fire-resistivity measures, country sides or rural areas


- built of indigenous materials such as bamboo, sawali, nipa, cogon (TYPE I AND II)

NON- FIRE RESTRICTED ZONES

- permitted within prescribed fire- resistivity measures for exterior walls of at least 2hr fire resistivity


- usual locations in suburban areas (TYPE II, III, AND IV)

FIRE RESTRICTIVE ZONES

- where in highly fire- resistive or non-combustible buildings assemblies of no less than 3-4 hr fire resistivity (TYPE IV AND V)

HIGHLY FIRE RESTRICTIVE ZONES

means the degree to which a material can withstand fire as determined by generally recognised and accepted testing methods

FIRE- RESISTIVE RATING

is the length of time a material can withstand being burned (1hr - 4hrs)

FIRE-RESISTIVE TIME PERIOD RATING

the secretary shall prescribe --- on the testing of construction materials for flame-spread characteristics etc...

FIRE-RESISTIVE REGULATIONS

OCT

ORIGINAL CERTIFICATE OF TITLE / ORIGINAL CERTIFICATE OF THE TITLE (BOOK REF)

TCT

TRANSFER CERTIFICATE OF THE TITLE

COA

COMMISSION ON AUDIT

"ECONOMIC AND SOCIALIZED HOUSING PROJECTS"

Batas Pambansa Bilang 220 (BP 220)

pumirma ng unang building code

Ferdinand Marcos

pumirma ng revised building code

Gloria Macapagal Arroyo

Pritzker winner ng 2024

RYKEN YAMAMOTO

# of sets ng plans sa fire safety requirements

1 set