Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
15 Cards in this Set
- Front
- Back
What is the precious Metals recovery Program designed to do?
|
It is designed to save DOD money by recycling precious metals, and using funds to offset cost of supplies for DOD activities.
|
|
Who has overall management responsibility for the Precious metal Recovery Program?
|
The Defense Logisitcs Agency (DLA).
|
|
Who is the DLA coordinator for all programs associated with the collection, recovery, and processing of precious metals?
|
The Defense Reutilization and Marketing Service (DRMS-OCP).
|
|
What are the Precious Metals included in the Recovery Program?
|
Silver, Gold, Platinum, and the Platinum family of noble metals( Palladium, Iridium, Rhodium, Osmium, and Ruthenium).
|
|
What is DRMS responsible for?
|
Procurement, major maintenance, and repair of recovery equipment.
|
|
Who Coordinates the PMRP for the Navy?
|
The Naval Supply Systems Command (COMNAVSUPSYSCOM).
|
|
Who is designated to be the PMRP coordinator for BUMED?
|
The Naval medical Logistics Command (NAVMEDLOGCOM).
|
|
What does goal number 1 of the 7 environmental goals for the Department of the Navy state?
|
Promote an environmental protection and natural resources stewardship ethic within the Navy workforce.
|
|
Who is required to participate in the PMRP?
|
All Naval Medical Department activities generating precious metals excesses and waste byproducts.
|
|
What is the first 3 steps a Naval Medical Department activities participating in the PMRP must do?
|
1- apoint in writing a PMRP coordinator to implement, monitor, and coordinate a formal PMRP.
2- Submit a quarterly Recovery of Precious Metals Report by last day of the month following end of each fiscal year. 3- collect all excess precious metal items for turn in to DRMO. |
|
What are the 4, 5 6, and 7th step a Naval Medical Department activities participating in the PMRP must do?
|
4- Operate and maintain assigned PMR equipment.
5- ensure all personnel are trained in the operation of recovery equipment. 6- establish and maintain records of silver test paper results, and dates of chemical recovery cartridge. 7- provide security for the recovery equipment. |
|
What are steps 8, 9, 10, 11,12 and 13 needed to be taken by those participating in the PMRP?
|
8- establish a PMRP audit board to review semiannually, the internal control procedures for precious metals.
9- Account for and turn in precious metal bearing items to DRMO. 10- Request PMRP supplies from DRMS-RPE 11- maintain contact with appropraite FSOs 12- maintain records on the PMRP participation of subordinate activities 13- MTFs and DTFs must use their internal resources to install recovery equipment. |
|
Who maintains liason with COMNAVSUPSYSCOM as the BUMED PMRP coordinator and prgram manager?
|
NAVMEDLOGCOM
|
|
Who prvides assistance and monitors all MTFs and DTFs reporting requirements and reviews and consolidates their quarterly reports?
|
NAVMEDLOGCOM
|
|
The quarterly Recovery and Utilizationof Precious metals Report is approved bythe Chief, BUMED for how many years from the date of this instruction?
|
3 years.
|