- Front
- Back
If a person is not sure a piece of equipment is safe to work on, he or her should
|
ask a qualified worker to indicate and explain the points of isolation
|
|
Safety meetings should routinely be held:
|
monthly
|
|
Ensuring the complete isolation of a piece of equipment prior to maintenance is the responsibility of:
|
both the Operating and Maintenance Departments
|
|
Work permits issued to work on isolated equipment require the signature of:
|
the isolator and the worker involved
|
|
After completing the isolation of equipment:
|
you must enter the completed isolations in the log book
|
|
In addition to opening the breaker when isolating electrical equipment the isolator should:
|
have the fuses removed by a qualified personnel
|
|
The best possible method of ensuring a boiler is fully isolated is to:
|
install blind flanges wherever required
|
|
When isolating a steam turbine driven centrifugal pump you should first:
|
close the high pressure steam supply valve
|
|
When Isolating a Steam Boiler you should first:
|
Isolate, Dran & lockout
|
|
When isolating a sodium zeolite softener you should first:
|
Close effluent valve
|
|
Last step in isolating a pump & driver is:
|
Open pump casing drain
|
|
Last step in isolating a boiler is:
|
Notify boiler inspector
|