• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/15

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

15 Cards in this Set

  • Front
  • Back

How is ACWP defined?

-actual cost of work accomplished

How is cost variance defined?

-BCWP - ACWP = CV

How is Scheduled Variance defined?

-BCWS - BCWP = SV

How is the cost performance index calculated?

-BCWP/ACWP

How is the schedule performance index calculated?

-BCWP/BCWS

How is the estimate at completion calculated?

-actuals to date + remaining work/efficiency factor

List the efficiency factors:

-Cumulative CPI: Tends to be optimistic




- Composite CPI: Tends to be pessimistic




- Three month CPI: Shows the most current cost performance




-six month CPI: Shows the most accurate




Weighted CPI: Weighs cost more than schedule



What does the integrated program management report DID provide?

- combines the Contract PerformanceReport (CPR) and Integrated Master Schedule (IMS)




-into a singleintegrated report to be consistent with good, disciplined programmanagement

What is EVM?

-An integrated process in the management and oversight of acquisition programs




-A management approach to ensure the total integration of cost, schedule and work scope aspects of the program

What EVM metric measures schedule?




What are some of the examples of the events?

-BCWS




-Program reviews, critical paths, scheduled simulations

What EVM metric measures performance?




What are some examples of its events?

-BCWP




-Tests, TMP, simulations, design reviews, system engineering

What EVM metric measure cost?




What are some examples of its events?

-EAC, BAC, ACWP




- Cost estimates, CFSR, CCDR, WBS

Budgeted Cost of Work Scheduled is defined as...

-Represents the value of work planned to be accomplished

Budgeted cost of work performed?

-represents the value of work accomplished in relation to the PMB

Actual cost of work performed?

-represents the actual cost of work accomplished