• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/19

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

19 Cards in this Set

  • Front
  • Back
What is used to identify problems and deficiencies in MPCs, Asset Maintenance Publications, selected COMDTINSTs, and Process Guides?
TMAPS Deficiency Reporting System

1-1
For changes to process guides, who will sign off the Deficiency Report as Tech Services?
ALC Engineering Officer

1-2
What are the only COMDTINSTs for which a user can generate a Deficiency Report using TMAPS?
Only those listed in TMAPS which are the responsibility of ALC ESD Technical Publications Branch

1-2
What are the three change types regarding deficiency reporting?
Procedural vs. nonprocedural
Interval Change
COMDT change

2-1
Once the originator initiates the Deficiency Report, what is the routing process?
Local QA
Engineering Officer
Prime Unit

2-1
What are the priority codes for CG-22s?
Urgent: 7days
Non-routine: 14 days
Routine: 90 days

2-2
For CG-22s requiring an interval change, where are they routed after Tech Services review?
Reliability-Centered Maintenance Manager

2-2
For CG-22s requiring a change to a COMDTINST, where are they routed after Tech Services review?
CG Headquarters, CG-41

2-2
After the RCM manager enters the necessary approval and priority codes, where is the CG-22 forwarded next?
MPC Contracting Officer Technical Representative (COTR)

2-2
For COMDTINST Manuals, who has the responsibility for final approval of changes?
CG-41

2-2
If Prime Unit disapproves a CG-22, is it still forwarded to Tech Services?
Yes

3-2
For a CG-22 for a publication change, what is the process flow?
Local QA
EO
Prime Unit
Tech Services
TPS Manager
TPS Final

Encl. 1 Fig. 1
For a CG-22 for a MPC interval change which affects HAZMAT, what is the process flow?
Local QA
EO
Prime Unit
Tech Services
HAZMAT
RCM
MPC COTR
MPC Published

Encl. 1 Fig. 1
For a CG-22 affecting a COMDTINST manual, what is the process flow?
Local QA
EO
Prime Unit
Tech Services
CG-41
TPS Manager
TPS Final

Encl. 1 Fig. 1
What happens to a CG-22 that is disapproved at the local QA level?
Deleted from the database
(notify originator as to why)

3-2
What is the maximum amount of attachments that may be added for each CG-22?
6

3-2
What happens to a CG-22 that is disapproved by the Engineering Officer?
Deleted from the database

3-2
Can Tech Services reverse Prime Unit's disapproval of a CG-22?
Yes

3-2
What happens to a CG-22 that is disapproved by Tech Services?
Archived in the CG-22 history

3-3