Water supply (kyuusui) header |
Water supply header |
|
|
Drain (haisui) header |
Drain of household |
|
|
Clear joint |
Clear joint |
|
|
Foundation sill (DODAI) material delivery |
Foundation sill material is delivered |
|
|
Foundation sill (DODAI) material |
Foundation sill material serves as base structure |
|
|
Complete set of Hardware (Kanamono) |
Construction hardware |
|
STEP 7 |
STEP 7 |
|
|
|
Steel stand (Kouseitsuka) |
Steel stand |
|
|
Anchor Bolt circumference airtight processing |
Anchor Bolt circumference airtight processing |
|
|
1F floor panel_airtight |
Airtight packing material |
|
|
1F floor panel wood preservation and anti-termite treatment |
chemically treated |
|
|
Unit Bath foundation insulation |
Unit Bath |
|
|
Foundation sill setting material panel completion |
Foundation sill setting and floor panel construction are completed. |
|
STEP 14 |
STEP 14 |
|
|
|
1F/2F outside wall panel |
Outside wall panel is delivered with sash, |
|
|
1F.2F outside wall panel joint part |
Joint part |
|
|
1F.2F outside wall panel airtight |
airtightness at joint part of all the outside wall |
|
|
Vertical alignment confirmation |
vertically straight |
|
|
Unit closet |
closet are all assembled at the factory |
|
|
Upper plate connection |
upper plate |
|
|
1F ceiling panel |
Since the joint part is structurally significant, |
|
|
Rubber asphalt roofing (for wall attached to roof) |
500mm |
|
|
Stairs unit |
the stair materials are made as unit in the factory. |
|
|
Unit balcony (waterproof pan) |
Balcony |
|
|
2F ceiling panel |
2F ceiling panel |
|
|
Yukadanbou piping |
Floor heating pipes with thickness 10mm |
|
|
Road cleaning (after Jyoutou) |
Clean the road |
|
|
Roof panel |
Roof panel |
|
|
Earthquake proof (Taishin) corner hardware |
wall and floor are firmly connected. |
|
|
Holddown hardware |
Holddown hardware |
|
|
Structural roofing completion |
After completing the roof part |
|
|
Band hardware |
wall panel and floor panel are firmly connected. |
|
|
1F ceiling |
1F living area |
|
|
Jyushi sash / j sash |
J sash |
|
|
Permeable waterproof sheet |
Permeable waterproof sheet |
|
|
1F Frame Work Construction (Jyoutou) completion |
1F ceiling panel is completed. |
|
|
Furring strips (Doubuchi) |
Furring strips |
|
STEP 33 |
STEP 33 |
|
|
|
Gable wall panel completion |
Gable wall panel |
|
|
2F Frame Work Construction (Jyoutou) completion |
2F was completed |
|
|
Yukadanbou piping pressure gauge |
Gauge |
|
|
Original solar panel |
This is roof-integrated solar panel that generate energy from the sun |
|
|
Entrance (Genkan) door |
Door |
|
|
Suido (water supply) piping |
water supply pipe is connected to each equipment. |
|
|
Rubber asphalt roofing |
100mm |
|
|
Yukadanbou Header Box |
Header box |
|
|
Original solar panel delivery |
This is original solar panel of Ichijyo. |
|
|
Yukadanbou panel |
Yukadanbou is designed per house based on the floor plan. |
|
|
Water supply piping (Suido) plan |
Water supply piping plan |
|
|
Water supply piping airtight |
Airtight processing is done around water supply piping |
|
|
Electrical (Denki) wiring |
electrical wiring is constructed following the layout |
|
|
Electrical (Denki) wiring plan |
Eectrical wiring plan |
|
|
Electrical (Denki) wiring airtight |
Airtight processing is done around electrical wiring |
|
|
Loss guard |
Loss guard |
|
|
Airtightness Measurement |
Airtightness Measurement |