55 Cards in this Set

  • Front
  • Back
  • 3rd side (hint)

Water supply (kyuusui) header

Water supply header

Drain (haisui) header

Drain of household

Clear joint

Clear joint

Foundation sill (DODAI) material delivery

Foundation sill material is delivered

Foundation sill (DODAI) material

Foundation sill material serves as base structure

Complete set of Hardware (Kanamono)

Construction hardware

STEP 7

STEP 7

Steel stand (Kouseitsuka)

Steel stand

Anchor Bolt circumference airtight processing

Anchor Bolt circumference airtight processing

1F floor panel_airtight

Airtight packing material

1F floor panel wood preservation and anti-termite treatment

chemically treated

Unit Bath foundation insulation

Unit Bath

Foundation sill setting material panel completion

Foundation sill setting and floor panel construction are completed.

STEP 14

STEP 14

1F/2F outside wall panel

Outside wall panel is delivered with sash,

1F.2F outside wall panel joint part

Joint part

1F.2F outside wall panel airtight

airtightness at joint part of all the outside wall

Vertical alignment confirmation

vertically straight

Unit closet

closet are all assembled at the factory

Upper plate connection

upper plate

1F ceiling panel

Since the joint part is structurally significant,

Rubber asphalt roofing (for wall attached to roof)

500mm

Stairs unit

the stair materials are made as unit in the factory.

Unit balcony (waterproof pan)

Balcony

2F ceiling panel

2F ceiling panel

Yukadanbou piping

Floor heating pipes with thickness 10mm

Road cleaning (after Jyoutou)

Clean the road

Roof panel

Roof panel

Earthquake proof (Taishin) corner hardware

wall and floor are firmly connected.

Holddown hardware

Holddown hardware

Structural roofing completion

After completing the roof part

Band hardware

wall panel and floor panel are firmly connected.

1F ceiling

1F living area

Jyushi sash / j sash

J sash

Permeable waterproof sheet

Permeable waterproof sheet

1F Frame Work Construction (Jyoutou) completion

1F ceiling panel is completed.

Furring strips (Doubuchi)

Furring strips

STEP 33

STEP 33

Gable wall panel completion

Gable wall panel

2F Frame Work Construction (Jyoutou) completion

2F was completed

Yukadanbou piping pressure gauge

Gauge

Original solar panel

This is roof-integrated solar panel that generate energy from the sun

Entrance (Genkan) door

Door

Suido (water supply) piping

water supply pipe is connected to each equipment.

Rubber asphalt roofing

100mm

Yukadanbou Header Box

Header box

Original solar panel delivery

This is original solar panel of Ichijyo.

Yukadanbou panel

Yukadanbou is designed per house based on the floor plan.

Water supply piping (Suido) plan

Water supply piping plan

Water supply piping airtight

Airtight processing is done around water supply piping

Electrical (Denki) wiring

electrical wiring is constructed following the layout

Electrical (Denki) wiring plan

Eectrical wiring plan

Electrical (Denki) wiring airtight

Airtight processing is done around electrical wiring

Loss guard

Loss guard

Airtightness Measurement

Airtightness Measurement