• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/32

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

32 Cards in this Set

  • Front
  • Back

Piping schedule chart

574 pg. 14

Damage mechanisms in 574

Pg 51

Structural thickness chart

574 pg#105

Material group specification in b16.5

Pg 5

Bolting specifications in 16.5

Pg 9

Flange face flaw chart in b16.5

Pg 155

Pressure table rating in b16.5 starts on :

Pg 116

Flange and fittings dimensions in b16.5 starts on :

Pg 166

Wire IQI selection in sec 5

Pg 30

Hole type IQI selection

Pg 35

RT setup chart in sect 5

Pg 62

Dwell time table in sect 5

Pg 193

P# chart in sec 9

Pg 93

RT acceptance criteria of qualification test in sect 9

Pg 21

Variables for WPS/PQR tables star on

Pg 36

Table for welding variables in sec 9 starts on

Pg 91

P#s used for tension test are found on tables in sect 9 starting at

Pg 93

Alternate base materials for welder qualification in sect 9

Pg 163

Table for base metals used for procedure qualification coupons in sec 9

Also pg 163

F#’s table in sec 9

Pg 164

Procedures T t tab in sec 9

Pg 175

Welder T t tab in sec 9

177

Positions tab in sect 9

Pg 186

“E” tab in b31.3

Pg 17 if spec is not given


Pg 335 if spec is given

Threaded components chart in b31.3

Pg 36

MDMT in b31.3

Pg 50-51

Impact test in b31.3

Pg 57

Preheat chart in b31.3

Pg 71

PWHT chart in b31.3

Pg 73

Hydro test and air test in b31.3

Pg 91-92

“S” or stress tab in b31.3

Pg 163

Thermal growth “F” table in b31.3

Pg371