Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
32 Cards in this Set
- Front
- Back
Piping schedule chart |
574 pg. 14 |
|
Damage mechanisms in 574 |
Pg 51 |
|
Structural thickness chart |
574 pg#105 |
|
Material group specification in b16.5 |
Pg 5 |
|
Bolting specifications in 16.5 |
Pg 9 |
|
Flange face flaw chart in b16.5 |
Pg 155 |
|
Pressure table rating in b16.5 starts on : |
Pg 116 |
|
Flange and fittings dimensions in b16.5 starts on : |
Pg 166 |
|
Wire IQI selection in sec 5 |
Pg 30 |
|
Hole type IQI selection |
Pg 35 |
|
RT setup chart in sect 5 |
Pg 62 |
|
Dwell time table in sect 5 |
Pg 193 |
|
P# chart in sec 9 |
Pg 93 |
|
RT acceptance criteria of qualification test in sect 9 |
Pg 21 |
|
Variables for WPS/PQR tables star on |
Pg 36 |
|
Table for welding variables in sec 9 starts on |
Pg 91 |
|
P#s used for tension test are found on tables in sect 9 starting at |
Pg 93 |
|
Alternate base materials for welder qualification in sect 9 |
Pg 163 |
|
Table for base metals used for procedure qualification coupons in sec 9 |
Also pg 163 |
|
F#’s table in sec 9 |
Pg 164 |
|
Procedures T t tab in sec 9 |
Pg 175 |
|
Welder T t tab in sec 9 |
177 |
|
Positions tab in sect 9 |
Pg 186 |
|
“E” tab in b31.3 |
Pg 17 if spec is not given Pg 335 if spec is given |
|
Threaded components chart in b31.3 |
Pg 36 |
|
MDMT in b31.3 |
Pg 50-51 |
|
Impact test in b31.3 |
Pg 57 |
|
Preheat chart in b31.3 |
Pg 71 |
|
PWHT chart in b31.3 |
Pg 73 |
|
Hydro test and air test in b31.3 |
Pg 91-92 |
|
“S” or stress tab in b31.3 |
Pg 163 |
|
Thermal growth “F” table in b31.3 |
Pg371 |