Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
7 Cards in this Set
- Front
- Back
PURPOSE: PGS |
Pure water for makeup to Rcs, Chemistry, and other systems requiring pure water. |
|
Purpose: Aerated Drains |
To collect and seperate oil from drain water before sending the water to the LngIslSound or a waste test tank. |
|
Purpose: Traveling Screens |
To filter ultimate heat sink for circ water and prevent damaging the ecological habbitate for sealife in which we circulate water to and from. |
|
Inches dp to trip in bcde bays |
36 inches |
|
Cwsp1a and cwsp1b pumps running are preferred because |
Chlorination from strainer lube water is more easily drawn to the circ water tunnel. |
|
Cooling water for sjae? |
Condensate. |
|
To open cwsmov23a discharge valve.. |
Cwsmov29a backwash valve must be closed. |