• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/35

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

35 Cards in this Set

  • Front
  • Back

ORM instruction?

OPNAV 3500.39D

What is the function of ORM?

It reduces or offsets risks by systematically identifying hazards and assessing and controlling the associated risks, allowing decisions to be made that weigh risks against mission or task benefits while assessing their potential impact on operations.

Navy’s ORM vision?

Is to develop an environment in which every officer, enlisted, or civilian person is trained and motivated to personally manage risk in everything they do.

What are the four pillars?

1. Policy and leadership


2. Training and education


3. Evaluation and accountability


4. Tools and resources

Concepts of the ORM process?

a. Decision making tool used by personnel at all levels.


b. Make informed decisions by providing a standardized process.


c. Minimize risks to acceptable levels.


d. Applies to off duty activities as well.

ORM key attributes?

1. Increases the probability of success.


2. Minimizes risk to acceptable levels.


3. Enhances decision making skills


4. Structure to perform risk assessments.


5. Improves confidence for individuals making informed decisions.


6. Avoids unnecessary risk, reducing mishaps.


7. Process for continuous feedback.


8. Identifies feasible and effective controls.

ORM does not do?

1. Inhibit flexibility initiative or accountability.


2. Remove risk altogether or support a zero defect mindset.


3. Remove the necessity for practice.


4. Sanction or justify violating the law or Navy ‘s standards.

Principles of ORM?

a. Accept risk when the benefits outweigh the costs.


b. Accept no unnecessary risk.


c. Anticipate and manage risk by planning.


d. Make risk decisions at the right level.

Levels of ORM?

a. In-depth


b. Deliberate


c. Time critical

ORM process?

1. Identify hazards


2. Assess hazards


3. Make risk decisions


4. Implement controls


5. Supervise

ORM guidelines?

Apply the process in sequence


Maintain balance in the process


Apply the process as a cycle


Involve people fully


Document the process

Complete risk assessment

Combine the severity with the probability to determine the risk assessment code. It is important to consider less severe consequences of a hazard if they are more likely than the worst credible consequence since this combination may actually present an equal or greater overall risk.

Risk assessment pitfalls?

Over optimism


Misrepresentation


Alarmism


Indiscrimination


Prejudice


Inaccuracy


Enumeration

Making risk decisions

Reject the risk


Avoid the risk


Delay an action


Transfer the risk


Compensate for the risk

What controls are there?

Engineering controls


Administrative controls


Physical controls

Time critical risk management

Applies to Operational risk management at the point of commencing or during execution of a mission or task at the time critical level where the five-step process has proven to be impractical.

A, B, C, D

Assess the situation


Balance resources


Communicate to others


Do and debrief the event

Purpose of ABCD model

The model creates a habit and trains the brain to continue thinking under duress or stress.

When to use ABCD?

Working in a dynamic environment


Monitoring a statistic or routine situation to capture errors


Making a decision with partial information

Habits of TRCM

Assess the situation


Balance resources


Communicate to others


Do and debrief the event

What are TRCM decisions based off?

Time critical decisions are based on pattern matching to pass training and experience and the recall of resources.

A= Assess

Identify hazards


Assess hazards

B= Balance resources

Make risk decisions

C= Communicate

Identify hazards


Assess hazards


Make risk decisions


Implement controls


Supervise

D= Do and dBrief

Implement controls


Supervise

What are the periodicities for training operational risk management?

Individual annually


Supervisor upon initial assignment and every 36 months


Assistant When selected


Manager every new tour

Catastrophic

Loss of the ability to accomplish the mission. Death or permanent total disability. Loss of a mission critical system or equipment. Unacceptable collateral damage

Critical

Significantly degraded mission capability our unit readiness. Permanent partial disability or severe injury or illness. Extensive damage to equipment our systems. Significant collateral damage.

Moderate

Degraded and mission capability are unit readiness. Minor damage to equipment systems property or the environment.Minor injury or illness.

Negligible

Little or no adverse impact on mission capability our unit readiness. Minimal threat to personnel safety or health. Slight equipment our system damage but fully functional and serviceable. Little or no property or environmental damage.

A

Frequent to occur. Continuously experienced To an individual item or person or continuously over a service life for an inventory of items or group.

B

Likely to occur immediately or within a short period of time. Expected to occur frequently to an individual item or person or continuously over a service life for an inventory of items our group.

C

Occasionally Will occur in time. Expected to occur several times to an individual item or person or frequently over a service life for an inventory of items or group.

D

Seldom may Occur in time. Can reasonably be expected to occur sometime to an individual item or person or several times over the service life for an inventory of items our group.

E

Unlikely it will occur in time. Unlikely to occur but possible in the service life for an inventory of items or group.