Who is designated as the ORM program manager?
|
The XO oversees command ORM training and impletation.
|
|
Where can you download TRACS (Total Risk Assessment Control System)?
|
www.safetycenter.navy.mil
|
|
What is the concept of ORM?
|
A decision making tool used by personnel at all levels to increase operational effectiveness by identifying, assembling, and managing risks.
|
|
What is the 5 step process of ORM?
|
1. Identify Hazards
2. Assess Hazards 3. Make Risk Decisions 4. Implement Controls 5. Supervise |
|
What are the 3 ORM process levels?
|
1. Time-Critical
2. Deliberate 3. In-Depth |
|
An "on the run" mental or oral review of the situation using the five step process without recording the information on paper is what ORM process level?
|
Time - Critical
|
|
Application of the complete 5 step process, will aid in planning an operation or evaluation procedures is what ORM process level?
|
Deliberate
|
|
Deliberate process involving a very thorough risk assessment (first two of the five steps) is what ORM process level?
|
In - Depth
|
|
What are the 4 principles of ORM?
|
1. Accept risk when the benefits outweigh the cost
2. Accept no unnecessary risk 3. Anticipate and manage risk by planning 4. Make risk decisions at the right level |
|
What is hazard severity?
|
An assessment of the worst credible consequences that can occur as a result of a hazard.
|
|
Category ____ - The hazard may cause death, loss of facility/asset or result in grave damage to national intrests.
|
Category I
|
|
category ____ - The hazard may cause severe injury, illness, property damage, damage to national or service intrests or degration to efficient use of assets.
|
Category II
|
|
Category ____ - The hazard may cause minor injury, illness, property damage, damage to national, service or command intrests or degration to efficient use of assets?
|
Category III
|
|
Category ____ - The hazard presents a minimal threat to personnel safety or health property, national, service or command intrests or efficient use of assets?
|
Category IV
|
|
______ ______ - The probability that a hazard will result in a mishap or loss?
|
Mishap Probability
|
|
Mishap Probability
Sub-category A - Sub-category B - Sub-category C - Sub-category D - |
A - Likely to occur
B - Probably will occur in time C - May occur in time D - Unlikely to occur |
|
The Risk Assessment Code (RAC) is an expression of risks that combines the elements of _______ and ________ ?
|
Hazard Severity and Mishap Probability
|
|
RAC definitions:
1 - 2 - 3 - 4 - 5 - |
1 - Critical risk
2 - Serious risk 3 - Moderate risk 4 - Minor risk 5 - Negligible risk |
|
What is Operational Risk Management?
|
A process used to minimize risk to acceptable levels in a variety of situations.
|
|
During which step would you use certain measures to attemp to reduce the degree of risk?
|
Implement controls
|
|
During which step would you monitor the work/activity to ensure it is carried out as planned and continually reassess the hazards and the controls?
|
Supervise
|
|
During which step would you identify conditions that may impede or degrade mission accomplishment?
|
Identify hazards
|
|
During which step would you determine a hazard's impact on the mission?
|
Assess the hazard
|
|
An expression in terms of severity and probability of possible loss or mission degration due to a hazard is known as __________.
|
Risk
|
|
The extent of mission degradation because the hazard produced a mishap, mission delay or stoppage is known as _________.
|
Severity
|
|
The likelihood that the hazard will produce a mishap, mission delay or stoppage otherwise degrade the mission is known as __________.
|
Probability
|
|
T or F, Step 5 (Supervise) can be summed up as: Try to plan ahead throughly and have backup plans and responses should situations change.
|
True
|
|
What step of the ORM process is to determine what control measures would most effectively lessen risks associated with each hazard.
|
Make risk decisions
|