• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/23

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

23 Cards in this Set

  • Front
  • Back

Employers and Owners

In a complex site, structural engineers,geo-tectnical engineers,riggers and crane manufacturers representatives may all need to be involved in a?

site analysis

the combination of ____ can severely damage the suspension of the crane

Rough roads and crane weight

when determining whether or not there is adequate access, you must consider the level, grade,and ___ of the roadways.

compaction

when setting up a lattice boom crane, one consideration is having enough space ____.

to fully extend the boom on the ground

it is important that ___ understand all aspects of crane setup, site preparation and site

Operator

the methodical process that attempts to identify hazards and devise plans to overcome or eliminate all hazards which may interfere with crane operations is reflected in the ____

Site analysis

when in doubt of the surroundings at a crane site, it wise to consult with the____ about the exact location of possible hazards

local utility company

During transport and setup, the ____ of a crane can break through the ground and cause damage.

Wheels and crawlers

when a signal person raps on his hard hat with their fist you should?

Use the main hoist

what minimum clearances required between the counterweights and any obstruction,

2 feet

pinch point clearance ensures that. o one will be inadvertently trapped or crushed and that _____

clearance is provided for the crane as the lift is being conducted.

what will happen if a crane is not set up within 1% of level

crane stability will be negatively impacted

trenches, cellars, embankments, flowing water and standing water all have a direct effect on the ____?

compaction and ground

standby cranes shout be inspected at ____?

Semiannually

when you are performing your daily PM check you notice that there is a pool of oil under your crane. you should_____?

note it on your report and check with your supervisor

when operating near power line you should use _____ to avoid hitting them

signal person

when load rotation may be hazardous a _____ should be used.

tag line

during lift operations what is the ANSI B30.5 minimum clearance from overhead power lines rated at 60kV?

15 feet

the minimum required clearance from over head power lines tated at 345kV for a crane in transit is ?

16 feet

measures and displays the weight of the load being hoisted

load indicator

used solenoid-operated blocking and bypass valves

selected control lock out system

measures how far the boom is extended

boom length sensor