• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/12

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

12 Cards in this Set

  • Front
  • Back
Preheaters get full full flow steam from Main Steam ou of the _____
Equalizing Header
The water seperator drains to the _____ through a Loop Seal
Offgas Condenser
What happens if Loop Seals are blown?
Airborne Particulates will the inside the Turbine Building
Hi-Hi-Hi alarm will isolate ____
Hydrogen Water Chemistry
Offgas condenser is cooled by ___
CNS
Cooler condenser and Dryer chillers are cooled by ___
Glycol
Loss of seal steam to ____ will result in loss of vacuum
Hoggers
__psig / ___ / __% power will initiate SJAEs
250psig / 145MWT / 5 pwr
Low steam supply to _____ will result in the closure of AOV - 1A/1B
2nd Stage SJAE
Hoggers are started from the ___
MCR
Hoggers auto trip:
- Main steam line high rad ( 15 times normal or Rad monitor INOP)

-A or C (loss of RPS "A")

-Electrical Protection
SJAEs receive steam supply from the ____
Equalizing Header