Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
12 Cards in this Set
- Front
- Back
Preheaters get full full flow steam from Main Steam ou of the _____
|
Equalizing Header
|
|
The water seperator drains to the _____ through a Loop Seal
|
Offgas Condenser
|
|
What happens if Loop Seals are blown?
|
Airborne Particulates will the inside the Turbine Building
|
|
Hi-Hi-Hi alarm will isolate ____
|
Hydrogen Water Chemistry
|
|
Offgas condenser is cooled by ___
|
CNS
|
|
Cooler condenser and Dryer chillers are cooled by ___
|
Glycol
|
|
Loss of seal steam to ____ will result in loss of vacuum
|
Hoggers
|
|
__psig / ___ / __% power will initiate SJAEs
|
250psig / 145MWT / 5 pwr
|
|
Low steam supply to _____ will result in the closure of AOV - 1A/1B
|
2nd Stage SJAE
|
|
Hoggers are started from the ___
|
MCR
|
|
Hoggers auto trip:
|
- Main steam line high rad ( 15 times normal or Rad monitor INOP)
-A or C (loss of RPS "A") -Electrical Protection |
|
SJAEs receive steam supply from the ____
|
Equalizing Header
|