Domestic imposed load |
1.5 |
|
Hotel room imposed load |
2 |
|
Typical office imposed load |
2.5 above ground level, 3 at or below |
|
Communal areas with tables imposed load |
2 |
|
Classroom imposed load |
3 |
|
Museum and art gallery imposed load |
4 |
|
Shopping area imposed load |
4 |
|
Timber floor SDL |
0.5 |
|
Timber flat roof SDL |
0.8 |
|
Timber pitched roof SDL |
1.0 |
|
Internal RC SDL |
3 not including slab |
|
External RC slab SDL |
2.75 |
|
Metal deck roof SDL |
0.5 not including primary steel |
|
Steel clad steel frame all up load |
5-10 |
|
Masonry clad timber frame all up load |
10-15 |
|
Masonry walls and precast concrete slab all up load |
15-20 |
|
Masonry clad steel frame all up load |
15-20 |
|
Masonry clad concrete frame all up load |
20-25 |
|
One way slab s/d and span |
L/22-30, 5-6m |
|
Two way span concrete s/d and span |
L/24-35 and 6-11 |
|
Flat slab concrete s/d and span |
L/27 and 4-8 |
|
Close centre ribbed slab s/d and span |
L/23 and 6-14 |
|
Coffered slab s/d and span |
L/15-20 and 8-14 |
|
Post tensioned flat slab s/d and span |
L/35-40 and 9-10 |
|
Rectangular concrete beam s/d and span |
L/12 and 3-10 |
|
Flanged concrete beam s/d and span |
L/10 and 5-15 |
|
Concrete column s/d and span |
H/10-20 and 2.5-8 |
|
Concrete wall s/d and span |
H/30-35 and 2-4 |
|
Retaining concrete wall s/d and span |
H/10-14 (cantilever) and 2-8 |
|
Rule for concrete beam shear stress |
Less than 2MPa |
|
Shear stress in ribbed concrete slabs |
0.6MPa |
|
Stocky concrete column check |
Minimum column dimension = Clear column height/17.5 |
|
Allowance for moment in concrete columns |
Loads from floor immediately above multiplied by 1.25, 1.5, 2 for interior, edge and corner column |
|
Concrete column area estimate for stocky columns |
Ac= N/15, N/18, N/21 för C28/35 concrete containing 1,2,3% reinforcement |
|
Slab reinforcement estimate |
80-110 kg/m3 |
|
RC pad footing reinforcement estimate |
70-90kg/m3 |
|
Transfer slab reinforcement estimate |
150kg/m3 |
|
Pile cap/raft reinforcement estimate |
115kg/m3 |
|
Column reinforcement estimate |
150-450kg/m3 |
|
Ground beam reinforcement estimate |
230kg/m3 |
|
Beam reinforcement estimate |
220kg/m3 |
|
Retaining wall reinforcement estimate |
110kg/m3 |
|
Stair reinforcement estimate |
135kg/m3 |
|
Wall reinforcement estimate |
65kg/m3 |
|
Heavy industrial building all up reinforcement estimate |
125kg/m3 |
|
Commercial building all up reinforcement estimate |
95kg/m3 |
|
Institutional building all up reinforcement estimate |
85kg/m3 |
|
Steel primary beam/truss s/d and span |
L/10-15, 4-12 |
|
Steel secondary beam/truss s/d and span |
L/15-25, 4-20 |
|
Steel transfer beam/truss s/d and span |
L/10, 16-30 |
|
Steel castellated beam s/d and span |
L/10-15, 4-12 |
|
Steel plate girder s/d and span |
L/10-12, 10-30 |
|
Steel vierendeel girders s/d and span |
L/8-10, 6-18 |
|
Steel roof truss s/d and span |
L/12-20, 10-100 |
|
Steel pitched roof truss s/d and span |
L/5-10, 8-20 |
|
Steel light roof beam s/d and span |
L/18-30, 6-60 |
|
Steel lattice roof girder s/d and span |
L/12-15, 5-20 |
|
Steel space frame s/d and span |
L/15-30, 10-100 |
|
Steel uc s/d and span |
Single-storey: L/20-25, 2-8 Multi-storey: L/7-18, 2-4 |
|
Steel hollow section column s/d and span |
Single-storey: L/20-35, 2-8 Multi-storey: L/7-28, 2-4 |
|
Steel columns in buildings 2-3 storeys with Max 7m spans |
203 UC |
|
Steel columns in buildings up to 5 storeys high |
254 UC |
|
Steel columns in buildings up to 8 storeys high (or low rise with long spans) |
305 UC |
|
Steel columns in buildings 8 to 12 storeys high |
354 UC |
|
Steel column load enhancement for moments |
Top storey: 4x z-diff + 2x y-diff Intermediate storey: z-diff + y-diff Where 'diff' is the difference between span loads |
|
I value of truss |
I= Ac * d^2 / 2 |
|
Composite UB s/d and span |
Primary: L/19, 6-10 Secondary: L/23, 8-18 |
|
Composite UC s/d and span |
Primary: L/22, 6-10 Secondary: L/29, 8-18 |
|
Composite girder s/d and span |
Primary: L/15, >12 Secondary: L/25, >12 |
|
Timber domestic floor (50 wide joists at 400) s/d |
L/24 +25 to 50 |
|
Timber office floor (50 wide joists at 400) s/d |
L/15 |
|
Timber rafters (50 wide joists at 400) s/d |
L/24 |
|
Timber beams/purlins s/d |
L/10-15 |
|
Timber independent posts s/d |
Minimum 100mm2 |
|
Timber triangular truss s/d |
L/5-8 |
|
Timber rectangular truss s/d |
L/10-15 |
|
Timber plywood stress skin panels s/d |
L/30-40 |
|
Typical brick size |
215x102x65 +10mm for mortar |
|
Typical block size |
440x215x(75-215) +10mm for mortar |
|
Masonry fire resistance |
Typical 100mm wall: 2h structural, 4h non-structural |
|
Geotechnical FoS for scheme design |
2-3 |
|
Geotechnical design and abp usually controlled by |
25mm settlement allowance |
|
Geotechnical frost action typically negligible below |
450mm below ground level |
|
Max depth of pad and strip foundations |
3m |
|
Small and short piles are typically... While wide, long piles are typically... |
Bored, cast in-situ and driven steel piles respectively |
|
Pile max and min dimensions |
75-2000mm diameter, 5-100m Long |
|
Types of retaining structures |
Cantilever r.w., gravity r.w., piling r.w., anchored r.w., king post, sheet pile, contiguous piled wall, diagram wall, secant bored piled wall |