• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/15

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

15 Cards in this Set

  • Front
  • Back
  • 3rd side (hint)
Filters from control devices, friable asbestos waste material, and bags contaminated with commercial asbestos is not considered ACWM.
A. True
B. False
B. False
Emergency renovation operations include operations necessitated by nonroutine failures of equipment.
A. True
B. False
A. True
Grinding includes:
A. Mechanical chipping
B. Drilling
C. Blasting
D. A and B
D. A and B
Leak-tight means that:
A. Solids or liquids cannot escape or spill out
B. Solids cannot escape or spill out
C. Liquids cannot escape or spill out
D. None of the above
A. Solids or liquids cannot escape or spill out
Nonfriable asbestos-containing materials, when dry, cannot be:
A. Crumbled
B. Pulverized
C. Reduced to powder by hand pressure
D. All of the above
D. All of the above
What is the official word for taking out RACM or facility components that contain or are covered with RACM from any facility?
A. Denature
B. Remove
C. Dispose
D. Eliminate
B. Remove
Waste generator means any owner or operator of a source whose act or process produces asbestos-containing waste material.
A. True
B. False
A. True
No demolition or renovation activities may begin if it will:
A. Break up RACM
B. Dislodge RACM
C. Disturb RACM
D. Preclude access to the RACM
E. All of the above
E. All of the above
After a facility component covered with, coated with, or containing RACM has been taken out of the facility as a unit or in sections it shall be stripped or contained in leak-tight wrapping. If stripped, either:
A. Adequately wet the RACM during stripping
B. Use a local exhaust ventilation and collection system
C. A or B
D. None of the above
C. A or B
During periods when wetting operations are suspended due to freezing temperatures, the owner or operator must record the temperature in the area containing the facility components at:
A. The beginning of the work day
B. The middle of the work day
C. The end of the work day
D. All of the above
D. All of the above
Evidence of NESHAP training must be available:
A. At the work site
B. At the main office
C. No evidence is required
D. None of the above
A. At the work site
Category I nonfriable ACM contains how much asbestos?
A. At least 1%
B. Less than 1%
C. 1% or more
D. More than 1%
D. More than 1%
A facility can be a residential building with:
A. One Unit
B. Two Units
C. Three Units
D. Four Units
E. None of the above
E. None of the above
Demolition is defined as the “...wrecking or taking out of any structural member of a facility”.
A. True
B. False
B. False
Asphalt and vinyl floor tile which contains more than 1% asbestos is called:
A. VAT
B. VCT
C. ACT
D. Resilient Floor Covering
D. Resilient Floor Covering